国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Ocean Engineering

ISSN: 0029-8018

官网: https://www.sciencedirect.com/journal/ocean-engineering

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle

Robust Design Optimization for the refit of a cargo ship using real seagoing data

DOI:10.1016/j.oceaneng.2016.06.029

Received:2016-02-24 ; Revised:2016-04-19 ; Accepted:2016-06-20 ; Online:2016-07-19

- 2016 1.4 3.9

Advantages and disadvantages of thruster allocation procedures in preliminary dynamic positioning predictions

DOI:10.1016/j.oceaneng.2016.06.045

Received:2015-12-23 ; Revised:2016-06-16 ; Accepted:2016-06-28 ; Online:2016-07-18

- 2016 5.4 6.3

Near-field flow of submarines and ships advancing in a stable stratified fluid

DOI:10.1016/j.oceaneng.2016.06.038

Received:2016-02-19 ; Revised:2016-06-01 ; Accepted:2016-06-26 ; Online:2016-07-18

- 2016 3 4.3

Optimization of a twin-skeg container vessel by parametric design and CFD simulations

DOI:10.1016/j.ijnaoe.2016.05.008

Received:2015-10-29 ; Revised:2016-05-17 ; Accepted:2016-05-30 ; Online:2016-07-16

- 2016 6.2 7.1

Model tests on resistance and seakeeping performance of wave-piercing high-speed vessel with spray rails

DOI:10.1016/j.ijnaoe.2016.05.010

Received:2016-02-03 ; Revised:2016-05-18 ; Accepted:2016-05-22 ; Online:2016-07-16

- 2016 3 3.6

Numerical study on Wells turbine with penetrating blade tip treatments for wave energy conversion

DOI:10.1016/j.ijnaoe.2016.05.009

Received:2015-11-23 ; Accepted:2016-05-30 ; Online:2016-07-16

- 2016 5.6 6.3

Organic and heavy metal pollution in shipbreaking yards

DOI:10.1016/j.oceaneng.2016.06.036

Received:2015-12-11 ; Revised:2016-06-22 ; Accepted:2016-06-23 ; Online:2016-07-16

- 2016 6 6.5

Simulation model of the LNG carrier with podded propulsion, Part II: Full model and experimental results

DOI:10.1016/j.oceaneng.2016.06.024

Received:2015-12-16 ; Revised:2016-06-12 ; Accepted:2016-06-15 ; Online:2016-07-16

- 2016 5.5 6.1

Study on the squat of extra-large scale ship in the Three Gorges ship lock

DOI:10.1016/j.oceaneng.2016.07.001

Received:2015-07-23 ; Revised:2016-07-01 ; Accepted:2016-07-02 ; Online:2016-07-16

- 2016 11 11.5

Design and analysis of a novel ship pipeline welding auxiliary device

DOI:10.1016/j.oceaneng.2016.06.050

Received:2016-04-14 ; Revised:2016-06-28 ; Accepted:2016-06-29 ; Online:2016-07-16

- 2016 2 2.5