国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Engineering Structures

ISSN: 0141-0296

官网: https://www.sciencedirect.com/journal/engineering-structures

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle
Operational modal analysis of an eleven-span concrete bridge subjected to weak ambient excitations

DOI:10.1016/j.engstruct.2017.08.066

Received:2016-09-18 ; Revised:2017-06-15 ; Accepted:2017-08-30 ; Online:2017-09-12

- 2017 8.5 11.5
A numerical solution and evaluation of dynamic stiffness of pile groups and comparison to experimental results

DOI:10.1016/j.engstruct.2017.08.045

Received:2016-07-07 ; Revised:2017-07-14 ; Accepted:2017-08-17 ; Online:2017-09-12

- 2017 11.9 13.5
Numerical studies on the seismic responses of bridge structures with precast segmental columns

DOI:10.1016/j.engstruct.2017.08.018

Received:2017-04-06 ; Revised:2017-07-05 ; Accepted:2017-08-11 ; Online:2017-09-12

- 2017 2.5 4.2
Experimental and analytical investigation of end zone cracking in BT-78 girders

DOI:10.1016/j.engstruct.2017.08.014

Received:2017-04-12 ; Revised:2017-07-28 ; Accepted:2017-08-07 ; Online:2017-09-12

- 2017 3.1 3.9
Interfacial shear behavior of a high-strength pile to sleeve grouted connection

DOI:10.1016/j.engstruct.2017.08.035

Received:2017-01-11 ; Revised:2017-08-15 ; Accepted:2017-08-16 ; Online:2017-09-12

- 2017 6.7 7.2
Research on pretensioned modular frame test and simulations

DOI:10.1016/j.engstruct.2017.08.019

Received:2017-03-27 ; Revised:2017-07-20 ; Accepted:2017-08-11 ; Online:2017-09-12

- 2017 3.4 4.6

Stress-strain model for confined concrete with corroded transverse reinforcement

DOI:10.1016/j.engstruct.2017.08.049

Received:2017-03-21 ; Revised:2017-08-08 ; Accepted:2017-08-20 ; Online:2017-09-12

- 2017 4.2 5.1
Extraction of influence line through a fitting method from bridge dynamic response induced by a passing vehicle

DOI:10.1016/j.engstruct.2017.06.067

Received:2016-12-27 ; Revised:2017-06-25 ; Accepted:2017-06-27 ; Online:2017-09-12

- 2017 5.5 6.1
Experimental testing and numerical modelling of steel moment-frame connections under column loss

DOI:10.1016/j.engstruct.2017.08.068

Received:2016-10-24 ; Revised:2017-08-29 ; Accepted:2017-08-30 ; Online:2017-09-12

- 2017 9.8 10.3
In-plane failure mechanisms and strength design of circular steel planar tubular Vierendeel truss arches

DOI:10.1016/j.engstruct.2017.08.055

Received:2016-11-18 ; Revised:2017-08-18 ; Accepted:2017-08-18 ; Online:2017-09-12

- 2017 8.6 9.1