国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Engineering Structures

ISSN: 0141-0296

官网: https://www.sciencedirect.com/journal/engineering-structures

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle
Finite element modelling of pre-stressed concrete poles under downbursts and tornadoes

DOI:10.1016/j.engstruct.2017.10.047

Received:2017-04-28 ; Revised:2017-08-23 ; Accepted:2017-10-17 ; Online:2017-11-01

- 2017 3.4 5.7
Innovative use of a shape memory alloy ring spring system for self-centering connections

DOI:10.1016/j.engstruct.2017.10.039

Received:2017-05-19 ; Revised:2017-10-08 ; Accepted:2017-10-15 ; Online:2017-11-01

- 2017 4.3 5
Reliability-based design optimization and uncertainty quantification for optimal conditions of composite structures with non-linear behavior

DOI:10.1016/j.engstruct.2017.10.041

Received:2016-09-14 ; Revised:2017-10-11 ; Accepted:2017-10-16 ; Online:2017-11-01

- 2017 12.6 13.2
Evaluation and comparison of ultimate deformation limits for RC columns

DOI:10.1016/j.engstruct.2017.10.050

Received:2017-06-15 ; Revised:2017-09-17 ; Accepted:2017-10-18 ; Online:2017-11-01

- 2017 2.7 4.2
Experimental investigation on seismic performance of corroded reinforced concrete moment-resisting frames

DOI:10.1016/j.engstruct.2017.10.034

Received:2017-06-11 ; Revised:2017-10-11 ; Accepted:2017-10-12 ; Online:2017-11-01

- 2017 3.6 4.1
Hybrid approach to seismic reliability assessment of engineering structures

DOI:10.1016/j.engstruct.2017.10.037

Received:2017-06-22 ; Revised:2017-10-09 ; Accepted:2017-10-15 ; Online:2017-11-01

- 2017 3.2 3.8
Seismic response of liquid-containing tanks with emphasis on the hydrodynamic response and near-fault phenomena

DOI:10.1016/j.engstruct.2017.09.026

Received:2016-08-26 ; Revised:2017-06-14 ; Accepted:2017-09-12 ; Online:2017-11-01

- 2017 9.3 12.7
Identification of key design parameters for earthquake resistance of reinforced concrete shell structures

DOI:10.1016/j.engstruct.2017.10.043

Received:2016-09-30 ; Revised:2017-08-15 ; Accepted:2017-10-17 ; Online:2017-11-01

- 2017 10.2 12.7
The behaviour of jointed large-diameter reinforced concrete pipeline buried in various ground conditions

DOI:10.1016/j.engstruct.2017.10.049

Received:2017-03-01 ; Revised:2017-10-07 ; Accepted:2017-10-18 ; Online:2017-11-01

- 2017 6.9 7.7
Theoretical and numerical studies of elastic buckling and load resistance of double cross-arm pre-tensioned cable stayed buckling-restrained braces

DOI:10.1016/j.engstruct.2017.10.064

Received:2017-06-29 ; Revised:2017-10-06 ; Accepted:2017-10-25 ; Online:2017-11-01

- 2017 2.8 3.9