国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Structural Safety

ISSN: 0167-4730

官网: https://www.sciencedirect.com/journal/structural-safety

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle

Time-varying identification model for dam behavior considering structural reinforcement

DOI:10.1016/j.strusafe.2015.07.002

Received:2014-12-24 ; Revised:2015-06-21 ; Accepted:2015-07-02 ; Online:2015-07-13

- 2015 5.5 6.3

Markov approach to early diagnostics, reliability assessment, residual life and optimal maintenance of pipeline systems

DOI:10.1016/j.strusafe.2015.05.006

Received:2014-09-03 ; Revised:2015-04-03 ; Accepted:2015-05-14 ; Online:2015-06-25

- 2015 6.6 8.4

Application of endurance time method in performance-based optimum design of structures

DOI:10.1016/j.strusafe.2015.05.005

Received:2014-10-18 ; Revised:2015-05-21 ; Accepted:2015-05-23 ; Online:2015-06-12

- 2015 6.7 7.2

Multi-variate seismic demand modelling using copulas: Application to non-ductile reinforced concrete frame in Victoria, Canada

DOI:10.1016/j.strusafe.2015.05.004

Received:2014-07-26 ; Revised:2015-05-20 ; Accepted:2015-05-21 ; Online:2015-06-07

- 2015 9.5 10

Reliability analysis of concrete deck overlays

DOI:10.1016/j.strusafe.2015.05.003

Received:2015-02-03 ; Revised:2015-05-18 ; Accepted:2015-05-20 ; Online:2015-06-05

- 2015 3 3.5

A clustering approach for assessing external corrosion in a buried pipeline based on hidden Markov random field model

DOI:10.1016/j.strusafe.2015.05.002

Received:2014-05-09 ; Revised:2015-05-18 ; Accepted:2015-05-20 ; Online:2015-06-05

- 2015 12 12.5

An empirical comparison of machine learning techniques for dam behaviour modelling

DOI:10.1016/j.strusafe.2015.05.001

Received:2014-06-10 ; Revised:2015-05-01 ; Accepted:2015-05-04 ; Online:2015-06-04

- 2015 10.4 10.9

Limit state design criteria for FRP strengthening of RC bridge components

DOI:10.1016/j.strusafe.2015.03.004

Received:2014-12-31 ; Revised:2015-03-21 ; Accepted:2015-03-22 ; Online:2015-05-16

- 2015 2.2 2.7

Reliability assessment of reinforced concrete columns based on the P–M interaction diagram using AFOSM

DOI:10.1016/j.strusafe.2015.03.003

Received:2013-10-29 ; Revised:2014-12-02 ; Accepted:2015-03-22 ; Online:2015-04-11

- 2015 12.8 17

Multivariate analysis of extreme metocean conditions for offshore wind turbines

DOI:10.1016/j.strusafe.2015.03.002

Received:2014-03-27 ; Revised:2015-03-18 ; Accepted:2015-03-18 ; Online:2015-04-09

- 2015 11.4 11.9