国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Journal of Wind Engineering and Industrial Aerodynamics

ISSN: 0167-6105

官网: https://www.sciencedirect.com/journal/journal-of-wind-engineering-and-industrial-aerodynamics

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle

Effects of gap width on flow motions around twin-box girders and vortex-induced vibrations

DOI:10.1016/j.jweia.2015.01.009

Received:2014-06-26 ; Revised:2015-01-16 ; Accepted:2015-01-17 ; Online:2015-02-07

- 2015 6.3 6.8

Research on motion of wind-driven rain and rain load acting on transmission tower

DOI:10.1016/j.jweia.2015.01.008

Received:2014-03-07 ; Revised:2015-01-05 ; Accepted:2015-01-16 ; Online:2015-02-07

- 2015 9.7 10.5

Wind loads on photovoltaic arrays mounted parallel to sloped roofs on low-rise buildings

DOI:10.1016/j.jweia.2015.01.007

Received:2014-03-02 ; Revised:2015-01-09 ; Accepted:2015-01-10 ; Online:2015-01-30

- 2015 10 10.5

Harvesting wind energy for improving performance of Savonius rotor

DOI:10.1016/j.jweia.2015.01.003

Received:2014-03-22 ; Revised:2014-10-07 ; Accepted:2015-01-01 ; Online:2015-01-30

- 2015 6.2 9.5

An assessment of the sea breeze energy potential using small wind turbines in peri-urban coastal areas

DOI:10.1016/j.jweia.2015.01.002

Received:2014-04-11 ; Revised:2014-08-23 ; Accepted:2015-01-01 ; Online:2015-01-29

- 2015 4 8.8

Solutions to the compact debris flight equations

DOI:10.1016/j.jweia.2015.01.001

Received:2014-04-16 ; Revised:2014-10-06 ; Accepted:2015-01-01 ; Online:2015-01-23

- 2015 5.3 8.7

Design wind loads for open-topped storage tanks in various arrangements

DOI:10.1016/j.jweia.2014.12.013

Received:2014-07-14 ; Revised:2014-12-11 ; Accepted:2014-12-31 ; Online:2015-01-23

- 2015 4.5 5.7

A case study of gust factor of a strong typhoon

DOI:10.1016/j.jweia.2014.12.012

Received:2014-09-15 ; Revised:2014-12-28 ; Accepted:2014-12-28 ; Online:2015-01-17

- 2015 3 3.5

Experimental analysis of wakes in a utility scale wind farm

DOI:10.1016/j.jweia.2014.12.009

Received:2014-08-26 ; Revised:2014-12-02 ; Accepted:2014-12-20 ; Online:2015-01-17

- 2015 2.8 3.9

Editorial Board

DOI:10.1016/S0167-6105(15)00007-0

Online:2015-01-15

- 2015 - -