国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Energy and Buildings

ISSN: 0378-7788

官网: https://www.sciencedirect.com/journal/energy-and-buildings

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle

The impact of phase change materials assisted night purge ventilation on the indoor thermal conditions of office buildings in hot-arid climates

DOI:10.1016/j.enbuild.2017.06.035

Received:2016-12-15 ; Revised:2017-05-26 ; Accepted:2017-06-13 ; Online:2017-06-15

- 2017 4.9 6

A comprehensive cost-optimal approach for energy retrofit of existing multi-family buildings: Application to apartment blocks in Turkey

DOI:10.1016/j.enbuild.2017.06.026

Received:2016-12-21 ; Revised:2017-04-04 ; Accepted:2017-06-10 ; Online:2017-06-13

- 2017 3 5.7

Experimental study of green walls impacts on buildings in summer and winter under an oceanic climate

DOI:10.1016/j.enbuild.2017.06.032

Received:2016-11-15 ; Revised:2017-05-12 ; Accepted:2017-06-12 ; Online:2017-06-13

- 2017 5.5 7

The diversity of residential electricity demand – A comparative analysis of metered and simulated data

DOI:10.1016/j.enbuild.2017.06.006

Received:2016-11-02 ; Revised:2017-05-22 ; Accepted:2017-06-10 ; Online:2017-06-13

- 2017 6.2 7.3

Evaluating the effective distance between living walls and wall surfaces

DOI:10.1016/j.enbuild.2017.06.029

Received:2017-02-18 ; Revised:2017-06-07 ; Accepted:2017-06-12 ; Online:2017-06-13

- 2017 3.2 3.8

A green home decision-making tool: Sustainability assessment for homeowners

DOI:10.1016/j.enbuild.2017.06.017

Received:2017-02-23 ; Revised:2017-04-24 ; Accepted:2017-06-10 ; Online:2017-06-13

- 2017 1.5 3.6

Experimental and analytical approach on the Trombe wall thermal performance parameters characterization

DOI:10.1016/j.enbuild.2017.06.018

Received:2017-03-02 ; Revised:2017-05-17 ; Accepted:2017-06-10 ; Online:2017-06-13

- 2017 2.1 3.3

Simple inlet devices and their influence on thermal stratification in a hot water storage tank

DOI:10.1016/j.enbuild.2017.06.012

Received:2016-12-29 ; Revised:2017-04-19 ; Accepted:2017-06-10 ; Online:2017-06-13

- 2017 3.2 5.4

Experimental investigation of convective heat transfer from sewage in heat exchange pipes and the construction of a fouling resistance-based mathematical model

DOI:10.1016/j.enbuild.2017.06.025

Received:2016-11-10 ; Revised:2017-05-03 ; Accepted:2017-06-12 ; Online:2017-06-13

- 2017 5.3 7.1

Domestic building fabric performance: Closing the gap between the in situ measured and modelled performance

DOI:10.1016/j.enbuild.2017.06.028

Received:2017-03-14 ; Revised:2017-05-04 ; Accepted:2017-06-10 ; Online:2017-06-13

- 2017 1.2 2.9