国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Energy and Buildings

ISSN: 0378-7788

官网: https://www.sciencedirect.com/journal/energy-and-buildings

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle

Industrial demand side response modelling in smart grid using stochastic optimisation considering refinery process

DOI:10.1016/j.enbuild.2016.05.070

Received:2016-01-06 ; Revised:2016-05-18 ; Accepted:2016-05-20 ; Online:2016-05-20

- 2016 4 4.5

Satisfaction based Q-learning for integrated lighting and blind control

DOI:10.1016/j.enbuild.2016.05.067

Received:2015-11-18 ; Revised:2016-04-09 ; Accepted:2016-05-19 ; Online:2016-05-20

- 2016 4.3 6.1

A novel approach for the simulation-based optimization of the buildings energy consumption using NSGA-II: Case study in Iran

DOI:10.1016/j.enbuild.2016.05.052

Received:2015-12-25 ; Revised:2016-05-16 ; Accepted:2016-05-17 ; Online:2016-05-20

- 2016 4.3 4.8

Multi-objective optimization of building envelope design for life cycle environmental performance

DOI:10.1016/j.enbuild.2016.05.054

Received:2015-10-12 ; Revised:2016-05-17 ; Accepted:2016-05-18 ; Online:2016-05-20

- 2016 6.8 7.3

Corrigendum to “Thermal building modelling using Gaussian processes” [Energy Build. 119 (2016) 119–128]

DOI:10.1016/j.enbuild.2016.04.073

Online:2016-05-20

- 2016 - -

Empirical model for predicting the dehumidification effectiveness of a liquid desiccant system

DOI:10.1016/j.enbuild.2016.05.050

Received:2016-02-24 ; Revised:2016-05-14 ; Accepted:2016-05-17 ; Online:2016-05-20

- 2016 2.2 2.8

Domestic electricity load modelling by multiple Gaussian functions

DOI:10.1016/j.enbuild.2016.05.060

Received:2016-01-26 ; Revised:2016-04-11 ; Accepted:2016-05-19 ; Online:2016-05-20

- 2016 2.1 3.8

Editorial Board

DOI:10.1016/S0378-7788(16)30392-9

Online:2016-05-19

- 2016 - -

On-site assessment of the discharge coefficient of open windows

DOI:10.1016/j.enbuild.2016.05.051

Received:2015-10-14 ; Revised:2016-05-16 ; Accepted:2016-05-17 ; Online:2016-05-19

- 2016 6.7 7.2

Electric energy storage design decision method for demand responsive buildings

DOI:10.1016/j.enbuild.2016.05.048

Received:2015-12-10 ; Revised:2016-04-14 ; Accepted:2016-05-16 ; Online:2016-05-19

- 2016 3.7 5.3