国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Energy and Buildings

ISSN: 0378-7788

官网: https://www.sciencedirect.com/journal/energy-and-buildings

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle

Field measurements, assessments and improvement of Kang: Case study in rural northwest China

DOI:10.1016/j.enbuild.2015.11.049

Received:2015-07-09 ; Revised:2015-09-21 ; Accepted:2015-11-19 ; Online:2015-12-02

- 2016 2 4.4

Quantification of building embodied energy in China using an input–output-based hybrid LCA model

DOI:10.1016/j.enbuild.2015.11.032

Received:2015-02-18 ; Revised:2015-10-11 ; Accepted:2015-11-12 ; Online:2015-12-01

- 2016 7.4 8.9

Estimating the impact of climate change and local operational procedures on the energy use in several supermarkets throughout Great Britain

DOI:10.1016/j.enbuild.2015.11.038

Received:2015-07-13 ; Revised:2015-09-29 ; Accepted:2015-11-13 ; Online:2015-12-01

- 2016 2.1 4.1

Experimental study on the effectiveness of internal shading devices

DOI:10.1016/j.enbuild.2015.11.040

Received:2015-03-05 ; Revised:2015-10-15 ; Accepted:2015-11-13 ; Online:2015-12-01

- 2016 7 8.4

Editorial Board

DOI:10.1016/S0378-7788(15)00523-X

Online:2015-11-29

- 2015 - -

Innovative cool roofing membrane with integrated phase change materials: Experimental characterization of morphological, thermal and optic-energy behavior

DOI:10.1016/j.enbuild.2015.11.061

Received:2015-08-18 ; Revised:2015-11-07 ; Accepted:2015-11-24 ; Online:2015-11-29

- 2016 2.2 3.3

Dynamic energy evaluation and glazing layers optimization of façade building with innovative integration of PV modules

DOI:10.1016/j.enbuild.2015.11.060

Received:2015-08-13 ; Revised:2015-10-26 ; Accepted:2015-11-24 ; Online:2015-11-29

- 2016 2 3.4

Experimental study of a new multifunctional water source heat pump system

DOI:10.1016/j.enbuild.2015.11.069

Received:2015-09-05 ; Revised:2015-11-26 ; Accepted:2015-11-27 ; Online:2015-11-29

- 2016 2.3 2.8

An experimental study of a novel integrated desiccant air conditioning system for building applications

DOI:10.1016/j.enbuild.2015.11.065

Received:2014-09-26 ; Revised:2015-11-12 ; Accepted:2015-11-25 ; Online:2015-11-28

- 2016 13.3 14.2

Short-term residential electric load forecasting: A compressive spatio-temporal approach

DOI:10.1016/j.enbuild.2015.11.068

Received:2015-08-08 ; Revised:2015-11-26 ; Accepted:2015-11-27 ; Online:2015-11-28

- 2016 3.2 3.7