国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Energy and Buildings

ISSN: 0378-7788

官网: https://www.sciencedirect.com/journal/energy-and-buildings

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle

Post occupancy evaluation of social housing designed and built to Code for Sustainable Homes levels 3, 4 and 5

DOI:10.1016/j.enbuild.2015.10.014

Received:2015-06-04 ; Revised:2015-08-27 ; Accepted:2015-10-06 ; Online:2015-10-30

- 2016 2.3 4.1

Electrochromic device modeling using an adaptive neuro-fuzzy inference system: A model-free approach

DOI:10.1016/j.enbuild.2015.10.045

Received:2015-05-11 ; Revised:2015-09-09 ; Accepted:2015-10-22 ; Online:2015-10-30

- 2016 3.6 5.5

A linear optimization based controller method for real-time load shifting in industrial and commercial buildings

DOI:10.1016/j.enbuild.2015.10.046

Received:2015-06-26 ; Revised:2015-09-21 ; Accepted:2015-10-22 ; Online:2015-10-30

- 2016 2.4 3.9

Effect of an incompletely closed window shutter on indoor illuminance level and heat gain

DOI:10.1016/j.enbuild.2015.10.040

Received:2015-04-06 ; Revised:2015-09-03 ; Accepted:2015-10-18 ; Online:2015-10-30

- 2016 4.5 6.5

Linking measurements and models in commercial buildings: A case study for model calibration and demand response strategy evaluation

DOI:10.1016/j.enbuild.2015.10.042

Received:2015-06-06 ; Revised:2015-09-18 ; Accepted:2015-10-19 ; Online:2015-10-30

- 2016 3 4.5

An optimal differential pressure reset strategy based on the most unfavorable thermodynamic loop on-line identification for a variable water flow air conditioning system

DOI:10.1016/j.enbuild.2015.10.032

Received:2015-05-11 ; Revised:2015-08-28 ; Accepted:2015-10-15 ; Online:2015-10-28

- 2016 3.2 5.2

Performance evaluation of a mechanically ventilated heat recovery (MVHR) system as part of a series of UK residential energy retrofit measures

DOI:10.1016/j.enbuild.2015.09.059

Received:2015-05-21 ; Revised:2015-08-20 ; Accepted:2015-09-23 ; Online:2015-10-28

- 2016 2.6 4.2

Selection of prime mover for combined cooling, heating, and power systems based on energy savings, life cycle analysis and environmental consideration

DOI:10.1016/j.enbuild.2015.10.047

Received:2015-06-15 ; Revised:2015-10-07 ; Accepted:2015-10-23 ; Online:2015-10-28

- 2016 3.3 4.3

Choosing by advantages: A case study for selecting an HVAC system for a net zero energy museum

DOI:10.1016/j.enbuild.2015.10.023

Received:2015-05-13 ; Revised:2015-09-30 ; Accepted:2015-10-11 ; Online:2015-10-28

- 2016 4.2 5

An assessment of energy-saving solutions for the envelope design of high-rise buildings in temperate climates: A case study in the Netherlands

DOI:10.1016/j.enbuild.2015.10.049

Received:2015-05-30 ; Revised:2015-10-19 ; Accepted:2015-10-25 ; Online:2015-10-28

- 2016 4.3 4.9