国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Energy and Buildings

ISSN: 0378-7788

官网: https://www.sciencedirect.com/journal/energy-and-buildings

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle

Possible effects of future domestic heat pump installations on the UK energy supply

DOI:10.1016/j.enbuild.2014.07.076

Received:2013-08-20 ; Revised:2014-01-31 ; Accepted:2014-07-29 ; Online:2014-08-07

- 2014 5 11.4

Experimental comparison of zone cooling load between radiant and air systems

DOI:10.1016/j.enbuild.2014.07.080

Received:2013-12-05 ; Revised:2014-03-02 ; Accepted:2014-07-30 ; Online:2014-08-07

- 2014 2.4 7.9

Urban energy simulation: Simplification and reduction of building envelope models

DOI:10.1016/j.enbuild.2014.07.066

Received:2014-02-18 ; Revised:2014-04-30 ; Accepted:2014-07-26 ; Online:2014-08-07

- 2014 1.9 5.3

From hybrid model predictive control to logical control for shading system: A support vector machine approach

DOI:10.1016/j.enbuild.2014.07.084

Received:2014-06-03 ; Accepted:2014-07-29 ; Online:2014-08-07

- 2014 1.2 1.9

Establishment and experimental verification of PCM room's TRNSYS heat transfer model based on latent heat utilization ratio

DOI:10.1016/j.enbuild.2014.07.082

Received:2014-05-14 ; Revised:2014-07-26 ; Accepted:2014-07-29 ; Online:2014-08-07

- 2014 2 2.5

Cost model for optimum thicknesses of insulated walls considering indirect impacts and uncertainties

DOI:10.1016/j.enbuild.2014.07.090

Received:2014-03-24 ; Revised:2014-06-30 ; Accepted:2014-07-29 ; Online:2014-08-07

- 2014 2.8 4.2

Stochastic chiller sequencing control

DOI:10.1016/j.enbuild.2014.07.072

Received:2013-10-08 ; Revised:2014-03-17 ; Accepted:2014-07-29 ; Online:2014-08-07

- 2014 4.9 9.8

Influence of sidewall restriction on the maximum ceiling gas temperature of buoyancy-driven thermal flow

DOI:10.1016/j.enbuild.2014.07.070

Received:2013-09-27 ; Revised:2014-01-14 ; Accepted:2014-07-29 ; Online:2014-08-07

- 2014 3.2 10.2

Balancing energy efficiency and structural performance through multi-objective shape optimization: Case study of a rapidly deployable origami-inspired shelter

DOI:10.1016/j.enbuild.2014.07.063

Received:2014-06-16 ; Revised:2014-07-24 ; Accepted:2014-07-26 ; Online:2014-08-07

- 2014 0.8 1.3

Modeling, simulation and feasibility analysis of residential BIPV/T+ASHP system in cold climate—Canada

DOI:10.1016/j.enbuild.2014.07.081

Received:2014-04-04 ; Revised:2014-06-25 ; Accepted:2014-07-30 ; Online:2014-08-07

- 2014 2.3 3.9