国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Energy and Buildings

ISSN: 0378-7788

官网: https://www.sciencedirect.com/journal/energy-and-buildings

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle

Servers and data centers energy performance metrics

DOI:10.1016/j.enbuild.2014.04.036

Received:2014-04-13 ; Accepted:2014-04-16 ; Online:2014-05-29

- 2014 -0.6 0.1

Design of a multipurpose “zero energy consumption” building according to European Directive 2010/31/EU: Life cycle assessment

DOI:10.1016/j.enbuild.2014.05.027

Online:2014-05-29

- 2014 - -

Water and energy nexus of residential rainwater tanks at an end use level: Case of Australia

DOI:10.1016/j.enbuild.2014.05.018

Received:2013-11-26 ; Revised:2014-03-28 ; Accepted:2014-05-05 ; Online:2014-05-29

- 2014 3.6 5.3

Demand response for residential buildings based on dynamic price of electricity

DOI:10.1016/j.enbuild.2014.05.002

Received:2014-02-11 ; Revised:2014-05-01 ; Accepted:2014-05-03 ; Online:2014-05-29

- 2014 2.2 2.7

Editorial Board

DOI:10.1016/S0378-7788(14)00420-4

Online:2014-05-29

- 2014 - -

Experimental investigation and modelling of a low temperature PCM thermal energy exchange and storage system

DOI:10.1016/j.enbuild.2014.05.026

Online:2014-05-29

- 2014 - -

Development of an energy evaluation methodology to make multiple predictions of the HVAC&R system energy demand for office buildings

DOI:10.1016/j.enbuild.2014.04.046

Received:2013-08-07 ; Revised:2014-02-05 ; Accepted:2014-04-23 ; Online:2014-05-28

- 2014 5.6 8.6

Virtual Retrofit Model for aging commercial buildings in a smart grid environment

DOI:10.1016/j.enbuild.2014.05.004

Received:2014-02-09 ; Accepted:2014-05-05 ; Online:2014-05-28

- 2014 2.1 2.8

Review of free cooling system using phase change material for building

DOI:10.1016/j.enbuild.2014.05.021

Received:2014-03-30 ; Accepted:2014-05-09 ; Online:2014-05-27

- 2014 0.6 1.3

Energy retrofit and occupant behaviour in protected housing: A case study of the Brunswick Centre in London

DOI:10.1016/j.enbuild.2014.05.019

Received:2013-09-13 ; Revised:2014-05-09 ; Accepted:2014-05-14 ; Online:2014-05-26

- 2014 7.5 8.1