国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Energy and Buildings

ISSN: 0378-7788

官网: https://www.sciencedirect.com/journal/energy-and-buildings

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle

Thermal conductivity of lime mortars and calcined diatoms. Parameters influencing their performance and comparison with the traditional lime and mortars containing crushed marble used as renders

DOI:10.1016/j.enbuild.2014.02.065

Received:2013-06-11 ; Revised:2014-01-30 ; Accepted:2014-02-21 ; Online:2014-03-11

- 2014 7.3 8.5

Minimising energy usage for domestic cooling with off-peak PCM storage

DOI:10.1016/j.enbuild.2014.02.069

Received:2013-10-08 ; Revised:2013-11-29 ; Accepted:2014-02-21 ; Online:2014-03-11

- 2014 1.3 4.5

Impact of the lifespan of different external walls of buildings on greenhouse gas emissions under tropical climate conditions

DOI:10.1016/j.enbuild.2014.02.071

Received:2013-11-21 ; Revised:2014-02-18 ; Accepted:2014-02-22 ; Online:2014-03-11

- 2014 2.5 3.1

Study on intermittent operation strategies of a hybrid ground-source heat pump system with double-cooling towers for hotel buildings

DOI:10.1016/j.enbuild.2014.02.061

Received:2013-06-20 ; Revised:2014-01-18 ; Accepted:2014-02-21 ; Online:2014-03-11

- 2014 6.6 8.2

Plug load energy analysis: The role of plug loads in LEED certification and energy modeling

DOI:10.1016/j.enbuild.2014.02.072

Received:2013-12-06 ; Revised:2014-02-02 ; Accepted:2014-02-21 ; Online:2014-03-11

- 2014 1.5 2.6

Numerical study of earth-to-air heat exchanger for three different climates

DOI:10.1016/j.enbuild.2014.02.073

Received:2013-11-02 ; Revised:2014-02-14 ; Accepted:2014-02-22 ; Online:2014-03-11

- 2014 3 3.7

Uncertainty analysis of the computer model in building performance simulation

DOI:10.1016/j.enbuild.2014.02.070

Received:2013-11-26 ; Revised:2014-02-14 ; Accepted:2014-02-22 ; Online:2014-03-11

- 2014 2.2 2.9

Computational analysis of thermal performance of a passive family house built of hollow clay bricks

DOI:10.1016/j.enbuild.2014.02.066

Received:2013-10-03 ; Revised:2014-02-17 ; Accepted:2014-02-22 ; Online:2014-03-11

- 2014 4.1 4.7

Editorial Board

DOI:10.1016/S0378-7788(14)00186-8

Online:2014-03-11

- 2014 - -

A new calculation method for shape coefficient of residential building using Google Earth

DOI:10.1016/j.enbuild.2014.02.058

Received:2013-09-14 ; Revised:2013-12-17 ; Accepted:2014-02-14 ; Online:2014-03-06

- 2014 2.7 5.1