国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Energy and Buildings

ISSN: 0378-7788

官网: https://www.sciencedirect.com/journal/energy-and-buildings

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle

Scheduling-based real time energy flow control strategy for building energy management system

DOI:10.1016/j.enbuild.2014.02.008

Received:2013-04-01 ; Revised:2014-01-14 ; Accepted:2014-02-07 ; Online:2014-02-15

- 2014 9.1 10.4

Study on energy saving possibility of digital variable multiple air conditioning system in three office buildings in Shanghai

DOI:10.1016/j.enbuild.2014.01.031

Received:2013-06-30 ; Accepted:2014-01-09 ; Online:2014-02-14

- 2014 5.7 6.4

Data mining in building automation system for improving building operational performance

DOI:10.1016/j.enbuild.2014.02.005

Received:2013-07-11 ; Revised:2013-10-18 ; Accepted:2014-02-05 ; Online:2014-02-14

- 2014 2.8 7

Probability theory description of domestic hot water and heating demands

DOI:10.1016/j.enbuild.2014.01.050

Received:2014-01-16 ; Accepted:2014-01-28 ; Online:2014-02-12

- 2014 -0.3 0.4

Economic analysis of a solid oxide fuel cell cogeneration/trigeneration system for hotels in Hong Kong

DOI:10.1016/j.enbuild.2014.01.053

Received:2013-08-20 ; Revised:2014-01-24 ; Accepted:2014-01-29 ; Online:2014-02-12

- 2014 4.8 5.4

Measurement and verification of building systems under uncertain data: A Gaussian process modeling approach

DOI:10.1016/j.enbuild.2014.01.048

Received:2013-10-15 ; Revised:2014-01-10 ; Accepted:2014-01-30 ; Online:2014-02-12

- 2014 2.4 3.6

Optimal option of natural-gas district distributed energy systems for various buildings

DOI:10.1016/j.enbuild.2014.01.051

Received:2013-04-28 ; Revised:2014-01-02 ; Accepted:2014-01-28 ; Online:2014-02-11

- 2014 7.8 9.2

A modified method of calculating the heating load for residential buildings

DOI:10.1016/j.enbuild.2014.01.047

Received:2013-12-19 ; Revised:2014-01-09 ; Accepted:2014-01-25 ; Online:2014-02-10

- 2014 0.7 1.2

Energy and investment intensity of integrated renovation and 2030 cost optimal savings

DOI:10.1016/j.enbuild.2014.01.044

Received:2014-01-12 ; Accepted:2014-01-25 ; Online:2014-02-10

- 2014 -0.3 0.4

The importance of the modulation ratio in the boilers installed in refurbished buildings

DOI:10.1016/j.enbuild.2014.01.043

Received:2014-01-28 ; Accepted:2014-01-31 ; Online:2014-02-08

- 2014 -0.6 0.1