国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Energy and Buildings

ISSN: 0378-7788

官网: https://www.sciencedirect.com/journal/energy-and-buildings

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle

An experimental investigation of energy saving potentials for room type variable-speed air conditioners in public offices: A case study from Istanbul

DOI:10.1016/j.enbuild.2013.09.020

Received:2013-04-22 ; Accepted:2013-09-14 ; Online:2013-09-23

- 2014 4.1 4.8

New phase-change material components for thermal management of the light weight envelope of buildings

DOI:10.1016/j.enbuild.2013.08.056

Received:2013-02-05 ; Accepted:2013-08-27 ; Online:2013-09-20

- 2014 6.1 6.8

Model-based controllers for indoor climate control in office buildings – Complexity and performance evaluation

DOI:10.1016/j.enbuild.2013.09.019

Received:2013-06-18 ; Revised:2013-08-28 ; Accepted:2013-09-11 ; Online:2013-09-20

- 2014 1.9 2.8

Experimental study on concentration change of spray solution used for a novel non-frosting air source heat pump system

DOI:10.1016/j.enbuild.2013.08.055

Received:2013-02-03 ; Accepted:2013-08-27 ; Online:2013-09-20

- 2014 6.1 6.8

An experimental study of natural and mixed convection over cooled vertical room wall

DOI:10.1016/j.enbuild.2013.09.014

Received:2013-06-10 ; Accepted:2013-09-09 ; Online:2013-09-19

- 2014 2.3 3

Network synergy effect: Establishing a synergy between building network and peer network energy conservation effects

DOI:10.1016/j.enbuild.2013.09.017

Received:2012-11-29 ; Accepted:2013-09-10 ; Online:2013-09-19

- 2014 8.8 9.5

Evaluation of air distribution system's airflow performance for cooling energy savings in high-density data centers

DOI:10.1016/j.enbuild.2013.09.013

Received:2013-07-23 ; Accepted:2013-09-09 ; Online:2013-09-18

- 2014 0.9 1.6

An empirical study of electricity and gas demand drivers in large food retail buildings of a national organisation

DOI:10.1016/j.enbuild.2013.09.015

Received:2013-04-20 ; Revised:2013-09-04 ; Accepted:2013-09-09 ; Online:2013-09-17

- 2014 4.1 4.7

An experimental investigation of a two-dimensional prototype of a transparent transpired collector

DOI:10.1016/j.enbuild.2013.09.010

Received:2013-05-20 ; Revised:2013-09-02 ; Accepted:2013-09-07 ; Online:2013-09-16

- 2014 3 3.7

Raw-water source heat pump for a vertical water treatment building

DOI:10.1016/j.enbuild.2013.09.011

Received:2013-06-11 ; Revised:2013-08-30 ; Accepted:2013-09-07 ; Online:2013-09-16

- 2014 2.2 2.9