国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Energy and Buildings

ISSN: 0378-7788

官网: https://www.sciencedirect.com/journal/energy-and-buildings

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle
Assessment of single-family house thermal renovation based on comprehensive on-site diagnostics

DOI:10.1016/j.enbuild.2017.09.069

Received:2017-07-05 ; Revised:2017-09-19 ; Accepted:2017-09-25 ; Online:2017-09-28

- 2018 2.1 2.7
Performance study on different location of double layers SSPCM wallboard in office building

DOI:10.1016/j.enbuild.2017.09.075

Received:2017-04-10 ; Revised:2017-09-11 ; Accepted:2017-09-25 ; Online:2017-09-28

- 2018 4.7 5.6

Thermal analysis of extensive green roofs combined with night ventilation for space cooling

DOI:10.1016/j.enbuild.2017.09.080

Received:2016-11-02 ; Revised:2017-09-18 ; Accepted:2017-09-25 ; Online:2017-09-28

- 2017 10.2 10.9

IEA EBC Annex 66: Definition and simulation of occupant behavior in buildings

DOI:10.1016/j.enbuild.2017.09.084

Received:2017-05-29 ; Revised:2017-09-11 ; Accepted:2017-09-26 ; Online:2017-09-28

- 2017 3 4

Facile preparation of porous plaster board containing phase change capsules using gel template

DOI:10.1016/j.enbuild.2017.09.074

Received:2017-07-18 ; Revised:2017-09-12 ; Accepted:2017-09-25 ; Online:2017-09-28

- 2017 1.4 2.3

Development of novel composite PCM for thermal energy storage using CaCl2·6H2O with graphene oxide and SrCl2·6H2O

DOI:10.1016/j.enbuild.2017.09.081

Received:2017-04-01 ; Revised:2017-08-20 ; Accepted:2017-09-25 ; Online:2017-09-28

- 2017 4.2 5.9

Air source integrated heat pump simulation model for EnergyPlus

DOI:10.1016/j.enbuild.2017.09.064

Received:2017-06-22 ; Revised:2017-09-21 ; Accepted:2017-09-23 ; Online:2017-09-28

- 2017 2.6 3.1

Thermal and energy performance of a steel-bamboo composite wall structure

DOI:10.1016/j.enbuild.2017.09.083

Received:2017-02-03 ; Revised:2017-09-25 ; Accepted:2017-09-26 ; Online:2017-09-28

- 2017 7.3 7.8

The staged retrofit of a solid wall property under controlled conditions

DOI:10.1016/j.enbuild.2017.09.033

Received:2017-03-30 ; Revised:2017-09-13 ; Accepted:2017-09-13 ; Online:2017-09-28

- 2017 5.1 5.6

Regulating top albedo and bottom emissivity of concrete roof tiles for reducing building heat gains

DOI:10.1016/j.enbuild.2017.09.090

Received:2017-07-04 ; Revised:2017-09-23 ; Accepted:2017-09-28 ; Online:2017-09-28

- 2017 2.2 2.9