国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Journal of Construction Engineering and Management

ISSN: 0733-9364

官网: https://ascelibrary.org/journal/jcemd4

出版商: ASCE

Title Scholar cited Year Review Cycle Accept Cycle
Work Values across Generations among Construction Professionals in the United States

DOI:10.1061/(ASCE)CO.1943-7862.0001554

Received:2017-11-21 ; Accepted:2018-04-23 ; Online:2018-07-30

- 2018 4.4 5.1
Interactive Effects of Supportive Leadership and Top Management Team’s Charismatic Vision in Predicting Worker Retention in the Philippines

DOI:10.1061/(ASCE)CO.1943-7862.0001553

Received:2017-12-14 ; Accepted:2018-04-18 ; Online:2018-07-28

- 2018 3.5 4.2
Competitive Dialogue in Norwegian Public Infrastructure Projects

DOI:10.1061/(ASCE)CO.1943-7862.0001540

Received:2017-12-07 ; Accepted:2018-03-21 ; Online:2018-07-27

- 2018 2.8 3.5
New Approach to the Distribution of Project Completion Time in PERT Networks

DOI:10.1061/(ASCE)CO.1943-7862.0001552

Received:2017-10-04 ; Accepted:2018-04-18 ; Online:2018-07-25

- 2018 5.8 6.5
Construction Accidents in a Large-Scale Public Infrastructure Project: Severity and Prevention

DOI:10.1061/(ASCE)CO.1943-7862.0001545

Received:2017-10-10 ; Accepted:2018-04-09 ; Online:2018-07-20

- 2018 5.3 6
Best-Value Procurement in Design-Bid-Build Construction Projects: Empirical Analysis of Selection Outcomes

DOI:10.1061/(ASCE)CO.1943-7862.0001550

Received:2017-12-13 ; Accepted:2018-04-17 ; Online:2018-07-18

- 2018 3.5 4.2
Dynamics of Collaborative Networks between Contractors and Subcontractors in the Construction Industry: Evidence from National Quality Award Projects in China

DOI:10.1061/(ASCE)CO.1943-7862.0001555

Received:2017-11-22 ; Accepted:2018-04-27 ; Online:2018-07-16

- 2018 4.5 5.2
Evaluating Highway Construction Projects’ Sustainability Using a Multicriteria Group Decision-Making Model Based on Bootstrap Simulation

DOI:10.1061/(ASCE)CO.1943-7862.0001514

Received:2017-08-10 ; Accepted:2018-01-23 ; Online:2018-07-16

- 2018 4.8 5.5
Dynamic Modeling of Multifactor Construction Productivity for Equipment-Intensive Activities

DOI:10.1061/(ASCE)CO.1943-7862.0001549

Received:2017-11-09 ; Accepted:2018-04-13 ; Online:2018-07-12

- 2018 4.5 5.2
Improved Critical Path Method with Trapezoidal Fuzzy Activity Durations

DOI:10.1061/(ASCE)CO.1943-7862.0001541

Received:2017-10-21 ; Accepted:2018-03-21 ; Online:2018-07-11

- 2018 4.3 5