国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Journal of Structural Engineering

ISSN: 0733-9445

官网: https://ascelibrary.org/journal/jsendh

出版商: ASCE

Title Scholar cited Year Review Cycle Accept Cycle
Improved Symmetry Method for the Mobility of Regular Structures Using Graph Products

DOI:10.1061/(ASCE)ST.1943-541X.0001512

Received:2015-02-25 ; Accepted:2016-01-11 ; Online:2016-03-28

- 2016 10 10.7
Enhanced Solution Scheme for Nonlinear Analysis of Force-Based Beam for Large Rotations, Multiple Critical Points, and Random Quasi-Static Loading Input

DOI:10.1061/(ASCE)ST.1943-541X.0001517

Received:2015-08-13 ; Accepted:2016-01-19 ; Online:2016-03-24

- 2016 4.6 5.3
Seismic CFST Column-to-Precast Cap Beam Connections for Accelerated Bridge Construction

DOI:10.1061/(ASCE)ST.1943-541X.0001505

Received:2015-08-17 ; Accepted:2016-01-04 ; Online:2016-03-23

- 2016 4 4.7
Ultimate Strain Criteria for RC Members in Monotonic or Cyclic Flexure

DOI:10.1061/(ASCE)ST.1943-541X.0001501

Received:2015-07-28 ; Accepted:2015-12-17 ; Online:2016-03-22

- 2016 4 4.7
Effects of Geometric Imperfections on Flexural Buckling Resistance of Laterally Braced Columns

DOI:10.1061/(ASCE)ST.1943-541X.0001508

Received:2015-05-24 ; Accepted:2016-01-05 ; Online:2016-03-22

- 2016 6.8 7.5
Evaluating the Behavior of Anchor Rod Foundations for High-Mast Light Poles Using Nonlinear Finite-Element Analysis

DOI:10.1061/(ASCE)ST.1943-541X.0001495

Received:2015-06-30 ; Accepted:2015-12-10 ; Online:2016-03-22

- 2016 4.7 5.4
Reliability-Based Inspection Protocols for Mast-Arm Sign Support Structures

DOI:10.1061/(ASCE)ST.1943-541X.0001497

Received:2014-08-14 ; Accepted:2015-12-17 ; Online:2016-03-18

- 2016 15.6 16.3
Modeling Error Uncertainty Characterization for Reliability-Based Fatigue Assessment in Sign Support Structures

DOI:10.1061/(ASCE)ST.1943-541X.0001283

Received:2013-08-29 ; Accepted:2015-01-12 ; Online:2016-03-18

- 2016 16 16.7
Detail Categories for Reliability-Based Fatigue Evaluation of Mast-Arm Sign Support Structures

DOI:10.1061/(ASCE)ST.1943-541X.0001498

Received:2014-08-14 ; Accepted:2015-12-17 ; Online:2016-03-18

- 2016 15.6 16.3
Nailed Connection Behavior in Light-Frame Wood Shear Walls with an Intermediate Layer of Insulation

DOI:10.1061/(ASCE)ST.1943-541X.0001506

Received:2015-08-21 ; Accepted:2016-01-04 ; Online:2016-03-18

- 2016 3.8 4.5