Tunnelling and Underground Space Technology

ISSN: 0886-7798

官网: https://www.sciencedirect.com/journal/tunnelling-and-underground-space-technology

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle

Application and prospect of hard rock TBM for deep roadway construction in coal mines

DOI:10.1016/j.tust.2017.12.010

Received:2017-01-06 ; Revised:2017-09-07 ; Accepted:2017-12-07 ; Online:2017-12-22

- 2018 7.7 11.2

Development of wireless sensor networks for underground communication and monitoring systems (the cases of underground mine environments)

DOI:10.1016/j.tust.2017.12.015

Received:2017-07-24 ; Revised:2017-12-05 ; Accepted:2017-12-13 ; Online:2017-12-22

- 2018 4 4.7

Mixed empirical-numerical method for investigating tunnelling effects on structures

DOI:10.1016/j.tust.2017.12.008

Received:2017-06-21 ; Revised:2017-10-05 ; Accepted:2017-12-06 ; Online:2017-12-22

- 2018 3.1 5.6

A numerical study on smoke movement in a metro tunnel with a non-axisymmetric cross-section

DOI:10.1016/j.tust.2017.12.002

Received:2017-04-04 ; Revised:2017-09-20 ; Accepted:2017-12-06 ; Online:2017-12-22

- 2018 5.2 8.2

Numerical investigation of the influence of the yield stress of the yielding element on the behaviour of the shotcrete liner for yielding support

DOI:10.1016/j.tust.2017.12.019

Received:2016-06-22 ; Revised:2017-12-07 ; Accepted:2017-12-14 ; Online:2017-12-22

- 2018 17.3 18

Mechanical behaviour of fully grouted GFRP rock bolts under the joint action of pre-tension load and blast dynamic load

DOI:10.1016/j.tust.2017.12.007

Received:2016-12-24 ; Revised:2017-08-23 ; Accepted:2017-12-06 ; Online:2017-12-22

- 2018 7.6 11.6
Experimental study on the structural behaviors of jacking prestressed concrete cylinder pipe

DOI:10.1016/j.tust.2017.11.033

Received:2016-09-01 ; Revised:2017-05-25 ; Accepted:2017-11-26 ; Online:2017-12-22

- 2018 8.4 15
Revisiting crown stability of tunnels deeply buried in non-uniform rock surrounds

DOI:10.1016/j.tust.2017.12.006

Received:2017-05-15 ; Revised:2017-08-17 ; Accepted:2017-12-06 ; Online:2017-12-22

- 2018 2.7 6.8
Convergence-confinement curve analysis of excavation stress and strain resulting from blast-induced damage

DOI:10.1016/j.tust.2017.12.005

Received:2017-03-21 ; Revised:2017-07-12 ; Accepted:2017-12-06 ; Online:2017-12-22

- 2018 3.3 8.7
A jacking force study of curved steel pipe roof in Gongbei tunnel: Calculation review and monitoring data analysis

DOI:10.1016/j.tust.2017.12.016

Received:2017-06-30 ; Revised:2017-11-03 ; Accepted:2017-12-13 ; Online:2017-12-20

- 2018 3.7 5.5