Tunnelling and Underground Space Technology

ISSN: 0886-7798

官网: https://www.sciencedirect.com/journal/tunnelling-and-underground-space-technology

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle

Pressures on the lining of a large shield tunnel with a small overburden: A case study

DOI:10.1016/j.tust.2017.01.008

Received:2016-02-24 ; Revised:2016-10-26 ; Accepted:2017-01-09 ; Online:2017-02-28

- 2017 7.7 10.7

Detection of cavities around concrete sewage pipelines using impact-echo method

DOI:10.1016/j.tust.2017.02.002

Received:2016-04-17 ; Revised:2017-01-03 ; Accepted:2017-02-03 ; Online:2017-02-27

- 2017 8.2 9.7

Prediction of tunnel lining forces and deformations using analytical and numerical solutions

DOI:10.1016/j.tust.2017.01.015

Received:2015-10-15 ; Revised:2016-12-05 ; Accepted:2017-01-23 ; Online:2017-02-17

- 2017 13.4 15.5
Numerical studies on the smoke control by water mist screens with transverse ventilation in tunnel fires

DOI:10.1016/j.tust.2017.01.017

Received:2015-11-05 ; Revised:2017-01-17 ; Accepted:2017-01-29 ; Online:2017-02-17

- 2017 14.2 15

Impact of tidal level fluctuations on the structural behaviour of a segmental tunnel lining

DOI:10.1016/j.tust.2017.01.014

Received:2015-11-18 ; Accepted:2017-01-23 ; Online:2017-02-17

- 2017 13.7 14.4
Reliability analyses of underground openings with the point estimate method

DOI:10.1016/j.tust.2016.12.010

Received:2015-06-05 ; Revised:2016-11-24 ; Accepted:2016-12-21 ; Online:2017-02-17

- 2017 17.5 18.8

Reducing the computational requirements for simulating tunnel fires by combining multiscale modelling and multiple processor calculation

DOI:10.1016/j.tust.2016.12.016

Received:2015-12-09 ; Revised:2016-12-04 ; Accepted:2016-12-30 ; Online:2017-02-15

- 2017 11.6 12.9

Constitutive representation and damage degree index for the layered rock mass excavation response in underground openings

DOI:10.1016/j.tust.2017.01.016

Received:2016-03-09 ; Revised:2017-01-31 ; Accepted:2017-01-31 ; Online:2017-02-10

- 2017 10.5 10.9

The longitudinal response of buried large-diameter reinforced concrete pipeline with gasketed bell-and-spigot joints subjected to traffic loading

DOI:10.1016/j.tust.2016.12.020

Received:2016-04-15 ; Revised:2016-12-10 ; Accepted:2016-12-28 ; Online:2017-02-10

- 2017 7.5 8.6

Dynamic tests for a Constant-Resistance-Large-Deformation bolt using a modified SHTB system

DOI:10.1016/j.tust.2016.12.007

Received:2016-06-17 ; Revised:2016-11-12 ; Accepted:2016-12-12 ; Online:2017-02-09

- 2017 4.5 5.9