ISSN: 0886-7798
官网: https://www.sciencedirect.com/journal/tunnelling-and-underground-space-technology
出版商: Elsevier
| Title | Scholar cited | Year | Review Cycle | Accept Cycle |
|---|---|---|---|---|
|
A case study of the failure of Liziping tunnel DOI:10.1016/j.tust.2018.07.022 Received:2017-09-09 ; Revised:2018-04-09 ; Accepted:2018-07-09 ; Online:2018-07-13 |
- | 2018 | 6.6 | 10.1 |
|
Repairing a shield tunnel damaged by secondary grouting DOI:10.1016/j.tust.2018.07.016 Received:2018-02-02 ; Revised:2018-06-27 ; Accepted:2018-07-08 ; Online:2018-07-12 |
- | 2018 | 4.4 | 5.2 |
|
Rockburst characteristics in syncline regions and microseismic precursors based on energy density clouds DOI:10.1016/j.tust.2018.06.026 Received:2017-10-17 ; Revised:2018-04-18 ; Accepted:2018-06-27 ; Online:2018-07-11 |
- | 2018 | 5.6 | 8.4 |
|
An ensemble-based change-point detection method for identifying unexpected behaviour of railway tunnel infrastructures
DOI:10.1016/j.tust.2018.07.013 Received:2017-07-13 ; Revised:2017-12-13 ; Accepted:2018-07-07 ; Online:2018-07-10 |
- | 2018 | 4.6 | 12 |
|
Face destressing blast design for hard rock tunnelling at great depth DOI:10.1016/j.tust.2018.06.021 Received:2017-08-23 ; Revised:2018-03-12 ; Accepted:2018-06-27 ; Online:2018-07-09 |
- | 2018 | 6.2 | 10.3 |
|
Stochastic discontinuum analysis of hydrocarbon migration probability around an unlined rock cavern based on the discrete fracture networks
DOI:10.1016/j.tust.2018.06.030 Received:2017-07-16 ; Revised:2018-03-31 ; Accepted:2018-06-27 ; Online:2018-07-09 |
- | 2018 | 8.1 | 11.5 |
|
Reasonable overburden thickness for underwater shield tunnel
DOI:10.1016/j.tust.2018.06.016 Received:2017-08-05 ; Revised:2017-12-08 ; Accepted:2018-06-27 ; Online:2018-07-06 |
- | 2018 | 3.7 | 10.9 |
|
Editorial Board DOI:10.1016/S0886-7798(18)30673-4 Online:2018-07-06 |
- | 2018 | - | - |
|
Location selection of intra-city distribution hubs in the metro-integrated logistics system
DOI:10.1016/j.tust.2018.06.024 Received:2018-01-23 ; Revised:2018-04-02 ; Accepted:2018-06-27 ; Online:2018-07-06 |
- | 2018 | 1.8 | 5.2 |
|
A fuzzy comprehensive evaluation methodology for rock burst forecasting using microseismic monitoring
DOI:10.1016/j.tust.2018.06.029 Received:2017-08-09 ; Revised:2018-05-05 ; Accepted:2018-06-27 ; Online:2018-07-05 |
- | 2018 | 8.5 | 10.7 |