| Title | Scholar cited | Year | Review Cycle | Accept Cycle |
|---|---|---|---|---|
|
Operational River Discharge Forecasting with Support Vector Regression Technique Applied to Alpine Catchments: Results, Advantages, Limits and Lesson Learned
Keywords:Seasonal discharge forecast,Support vector regression,Snow cover area,Machine learning,Alpine Arc Received:2016-08-04 ; Accepted:2017-08-29 ; Online:2017-09-09 |
- | 2018 | 12.3 | 13 |
|
Variable Streamflow Contributions in Nested Subwatersheds of a US Midwestern Urban Watershed
Keywords:Nested watersheds,Double-mass analysis,Urban stream syndrome,Backwater,Bernaola-Galvan heuristic segmentation Received:2017-03-05 ; Accepted:2017-08-23 ; Online:2017-09-09 |
- | 2018 | 5 | 5.7 |
|
Application and Sensitivity Analysis of Artificial Neural Network for Prediction of Chemical Oxygen Demand
Keywords:Artificial neural network,Chemical oxygen demand,Water pollution,River restoration Received:2017-06-01 ; Accepted:2017-08-30 ; Online:2017-09-09 |
- | 2018 | 2.3 | 3 |
|
Performance Assessment of a Coupled Particle Swarm Optimization and Network Flow Programming Model for Optimum Water Allocation
Keywords:Water allocation planning,Simulation-optimization,Particle swarm optimization (PSO),Network flow programming (NFP) Received:2017-02-28 ; Accepted:2017-07-19 ; Online:2017-09-08 |
- | 2017 | 4 | 4.7 |
|
Optimal Location of Pump as Turbines (PATs) in Water Distribution Networks to Recover Energy and Reduce Leakage
Keywords:Energy saving,Water Leakage,Water losses,Pump as Turbines (PATs),Energy production,Water distribution networks Received:2017-03-09 ; Accepted:2017-07-28 ; Online:2017-09-07 |
- | 2017 | 4 | 4.7 |
|
A Multiobjective Stochastic Programming Model for Hydropower Hedging Operations under Inexact Information
Keywords:Hydropower operation,Hedging policy,Stochastic programming,Shadow price,Inexact information Received:2016-08-22 ; Accepted:2017-07-06 ; Online:2017-09-07 |
- | 2017 | 9.9 | 10.6 |
|
Optimal Design of Seasonal Flood Limited Water Levels by Jointing Operation of the Reservoir and Floodplains
Keywords:Floodwater utilization,Flood limited water level,Reservoir operation Received:2017-01-28 ; Accepted:2017-08-23 ; Online:2017-09-04 |
- | 2018 | 6.2 | 6.9 |
|
Erratum to: The Value of Rain: Benefit-Cost Analysis of Rainwater Harvesting Systems
Online:2017-09-02 |
- | 2017 | - | - |
|
Best Management Practices Optimization at Watershed Scale: Incorporating Spatial Topology among Fields
Keywords:BMPs optimization,Spatial topology,Genetic algorithm,Heuristic rule,Distributed hydrological model Received:2016-12-14 ; Accepted:2017-08-23 ; Online:2017-08-31 |
- | 2018 | 7.7 | 8.4 |
|
Maximizing the Firm Energy Yield Preserving Total Energy Generation Via an Optimal Reservoir Operation
Keywords:Differential evolution,Firm energy,Reliability,Optimization,Penalty Received:2016-10-04 ; Accepted:2017-08-23 ; Online:2017-08-31 |
- | 2018 | 10.1 | 10.8 |