ISSN: 1226-7988
官网: http://link.springer.com/journal/12205
出版商: Springer
| Title | Scholar cited | Year | Review Cycle | Accept Cycle |
|---|---|---|---|---|
|
A fuzzy model to determine construction firm strategies
Keywords:strategy,strategic management,miles and snows’ strategy typology,SWOT analysis,fuzzy logic,fuzzy sets Received:2013-04-29 ; Accepted:2013-11-18 ; Online:2014-06-20 |
- | 2014 | 6.1 | 6.8 |
|
Elastic shear modulus of compressible Chicago clay
Keywords:elastic shear modulus,bender elements,block sample,experiments,chicago clay,crosshole test,seismic CPT Received:2013-05-06 ; Revised:2013-09-25 ; Accepted:2013-11-19 ; Online:2014-06-20 |
- | 2014 | 4.3 | 6.6 |
|
Simulation of tensile cracking in earth structures with an adaptive RPIM-FEM coupled Method
Keywords:tensile cracking,radial point interpolation method,adaptive coupling,node refinement,smeared crack approach Received:2013-08-12 ; Accepted:2013-11-19 ; Online:2014-06-20 |
- | 2014 | 2.6 | 3.3 |
|
Effect of intermediate diaphragm on lateral load distribution factor of multicell box-girder bridges
Keywords:intermediate diaphragms,bridge,truck loading,distribution factor,finite element Received:2011-05-18 ; Revised:2013-09-03 ; Accepted:2013-11-13 ; Online:2014-06-20 |
- | 2014 | 27.5 | 30.3 |
|
Evaluating impact of waste factors on project performance cost in Vietnam
Keywords:lean construction,wastes,factor analysis,artificial neural network,Vietnam Received:2013-04-16 ; Revised:2013-09-24 ; Accepted:2013-11-17 ; Online:2014-06-20 |
- | 2014 | 4.9 | 7.2 |
|
Application of the Goda pressure formulae for horizontal wave loads on elevated structures
Keywords:wave force,wave pressure,elevated structure,air gap,random waves,Goda wave pressure formulae Received:2013-03-20 ; Accepted:2013-10-20 ; Online:2014-06-20 |
- | 2014 | 6.4 | 7.1 |
|
Impacts of knowledge management on the organizationlal success
Keywords:knowledge management,organizational success,project performance,construction industry institute Received:2013-04-29 ; Accepted:2013-11-07 ; Online:2014-06-20 |
- | 2014 | 5.7 | 6.4 |
|
Development of scheduling model for earth work using genetic algorithm
Keywords:earthmoving scheduling,equipment utilization,earthmoving,scheduling model,optimization Received:2013-07-03 ; Accepted:2013-11-05 ; Online:2014-06-20 |
- | 2014 | 3.5 | 4.2 |
|
Schedule compression in tunneling projects by adjusting workflow variability
Keywords:schedule compression,work scenario,workflow variability,tunnel boring operations,lean concept,simulation Received:2013-08-02 ; Accepted:2013-10-14 ; Online:2014-06-20 |
- | 2014 | 1.7 | 2.4 |
|
Prediction of compressive strength of self-compacting concrete using least square support vector machine and relevance vector machine
Keywords:compressive strength,concrete,least square support vector machine,relevance vector machine,variance Received:2012-10-24 ; Revised:2013-04-26 ; Accepted:2013-11-07 ; Online:2014-06-20 |
- | 2014 | 5.7 | 12.6 |