国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

The Structural Design of Tall and Special Buildings

ISSN: 1541-7794

官网: https://spssi.onlinelibrary.wiley.com/journal/15417808

出版商: Wiley Online Library

Title Scholar cited Year Review Cycle Accept Cycle

Shaking table model test and numerical analysis of a long‐span cantilevered structure

DOI:10.1002/tal.1478

Received:2017-06-13 ; Revised:2017-11-22 ; Accepted:2018-01-18 ; Online:2018-04-16

- 2018 4.9 7.3

Influence of infill configurations on seismic responses of steel self‐centering moment resisting frames

DOI:10.1002/tal.1474

Received:2017-11-01 ; Revised:2018-01-12 ; Accepted:2018-01-18 ; Online:2018-04-16

- 2018 1.9 2.6

Structural selection and accuracy control of the large aperture fully steerable antenna

DOI:10.1002/tal.1482

Received:2017-09-28 ; Revised:2018-01-06 ; Accepted:2018-01-25 ; Online:2018-04-06

- 2018 2.9 4

Seismic performance of reinforced concrete columns confined with two layers of stirrups

DOI:10.1002/tal.1484

Received:2017-07-20 ; Revised:2017-12-13 ; Accepted:2018-02-12 ; Online:2018-03-30

- 2018 4.4 6.9

The effect of design drift limit on the seismic performance of RC dual high‐rise buildings

DOI:10.1002/tal.1464

Received:2017-04-14 ; Revised:2017-08-22 ; Accepted:2017-11-29 ; Online:2018-03-30

- 2018 3.9 7.6

Approximate method of estimating seismic performance of high‐rise buildings with oil‐dampers

DOI:10.1002/tal.1473

Received:2017-06-08 ; Revised:2017-12-18 ; Accepted:2018-01-01 ; Online:2018-03-30

- 2018 6 6.9

Shaking table test and numerical simulation on vibration control effects of TMD with different mass ratios on a super high‐rise structure

DOI:10.1002/tal.1470

Received:2017-10-07 ; Revised:2017-12-17 ; Accepted:2017-12-21 ; Online:2018-03-24

- 2018 1.9 2.5

Prediction of typhoon design wind speed with cholesky decomposition method

DOI:10.1002/tal.1480

Received:2017-06-20 ; Revised:2017-12-20 ; Accepted:2018-01-25 ; Online:2018-03-24

- 2018 5.6 7.3

Optimal probability‐based partial mass isolation of elevated coal scuttle in thermal power plant building

DOI:10.1002/tal.1477

Received:2017-06-12 ; Revised:2017-11-19 ; Accepted:2018-01-18 ; Online:2018-03-24

- 2018 4.9 7.3

The wall–frame and the steel–concrete interactions in composite shear walls

DOI:10.1002/tal.1476

Received:2017-01-01 ; Revised:2017-12-24 ; Accepted:2018-01-18 ; Online:2018-03-12

- 2018 11.4 12.7