ISSN: 0378-7788
官网: https://www.sciencedirect.com/journal/energy-and-buildings
出版商: Elsevier
| Title | Scholar cited | Year | Review Cycle | Accept Cycle |
|---|---|---|---|---|
|
Experimental analysis of the summer thermal performances of a naturally ventilated rainscreen façade building DOI:10.1016/j.enbuild.2013.12.044 Received:2013-05-24 ; Revised:2013-08-02 ; Accepted:2013-12-23 ; Online:2014-01-07 |
- | 2014 | 1.9 | 7.1 |
|
Energy life-cycle approach in Net zero energy buildings balance: Operation and embodied energy of an Italian case study DOI:10.1016/j.enbuild.2013.12.046 Received:2013-05-04 ; Revised:2013-07-29 ; Accepted:2013-12-23 ; Online:2014-01-07 |
- | 2014 | 2.4 | 7.8 |
|
Techno-economic model for district heating systems DOI:10.1016/j.enbuild.2013.12.051 Received:2012-07-13 ; Revised:2013-12-26 ; Accepted:2013-12-27 ; Online:2014-01-06 |
- | 2014 | 17.2 | 17.7 |
|
A framework to monitor the integrated multi-source space heating systems to improve the design of the control system DOI:10.1016/j.enbuild.2013.12.049 Received:2013-07-08 ; Revised:2013-10-21 ; Accepted:2013-12-23 ; Online:2014-01-06 |
- | 2014 | 3 | 5.6 |
|
A study on different natural ventilation approaches at a residential college building with the internal courtyard arrangement DOI:10.1016/j.enbuild.2013.12.050 Received:2013-07-22 ; Revised:2013-10-01 ; Accepted:2013-12-22 ; Online:2014-01-05 |
- | 2014 | 1.9 | 5.1 |
|
Simulation study of a heat pump for simultaneous heating and cooling coupled to buildings DOI:10.1016/j.enbuild.2013.12.047 Received:2013-06-17 ; Revised:2013-11-26 ; Accepted:2013-12-20 ; Online:2014-01-05 |
- | 2014 | 4.9 | 6.2 |
|
The life cycle assessment of a solar-assisted absorption chilling system in Bangkok, Thailand DOI:10.1016/j.enbuild.2013.12.034 Received:2013-03-01 ; Revised:2013-12-14 ; Accepted:2013-12-23 ; Online:2014-01-04 |
- | 2014 | 9.1 | 9.9 |
|
A low-cost web-based infrared remote control system for energy management of aggregated air conditioners DOI:10.1016/j.enbuild.2013.12.035 Received:2013-03-06 ; Revised:2013-10-18 ; Accepted:2013-12-23 ; Online:2014-01-04 |
- | 2014 | 7.1 | 9.7 |
|
Design configuration for a higher efficiency air conditioning system in large space building DOI:10.1016/j.enbuild.2013.12.041 Received:2013-04-18 ; Revised:2013-11-29 ; Accepted:2013-12-23 ; Online:2014-01-04 |
- | 2014 | 7 | 8.3 |
|
Comparative analysis of decision-making methods for integrating cost and CO DOI:10.1016/j.enbuild.2013.12.045 Received:2013-04-30 ; Revised:2013-08-14 ; Accepted:2013-12-23 ; Online:2014-01-04 |
- | 2014 | 3.1 | 7.9 |