国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

KSCE Journal of Civil Engineering

ISSN: 1226-7988

官网: http://link.springer.com/journal/12205

出版商: Springer

Description:

The KSCE Journal of Civil Engineering is a technical monthly journal of the Korean Society of Civil Engineers. The journal reports original study results (both academic and practical) on past practices and present information in all civil engineering fields. The journal publishes original papers within the broad field of civil engineering, which includes, but are not limited to, the following: coastal and harbor engineering, construction management, environmental engineering, geotechnical engineering, highway engineering, hydraulic engineering, information technology, nuclear power engineering, railroad engineering, structural engineering, surveying and geo-spatial engineering, transportation engineering, tunnel engineering, and water resources and hydrologic engineering. Both theoretical and practice-oriented papers, including case studies and reviews, are encouraged. From 2018, the journal will be published monthly including two special issues, consisting of 50 papers per issue.

Title Scholar cited Year Review Cycle Accept Cycle
Effects of phosphate dispersants on the liquid limit, sediment volume and apparent viscosity of clayey soil/calcium-bentonite slurry wall backfills

Authors:Yan-Jun Du,Yu-Ling Yang,Ri-Dong Fan,Fei Wang

Keywords:dispersant,liquid limit,soil-bentonite,slurry wall,sedimentation

DOI:10.1007/s12205-015-0567-x

Received:2014-09-24 ; Revised:2015-02-27 ; Accepted:2015-04-01 ; Online:2015-05-01

- 2016 4.7 6.3
Bulk utilization of flyash in self compacting concrete

Authors:R. Venkatakrishnaiah,G. Sakthivel

Keywords:high volume fly ash concrete,Ground Granulated Blast furnace Slag (GGBS),silica fume,durability and saturated water absorption

DOI:10.1007/s12205-015-0706-4

Received:2013-11-28 ; Revised:2014-05-15 ; Accepted:2014-10-13 ; Online:2015-05-01

- 2015 5.1 10.6
Evaluation of nonlinear Muskingum model with continuous and discontinuous exponent parameters

Authors:Said M. Easa

Keywords:flood routing,continuous and discontinuous,exponent parameter,optimization,muskingum model,calibration,dimensionless inflow

DOI:10.1007/s12205-015-0154-1

Received:2014-03-25 ; Revised:2014-08-10 ; Accepted:2014-09-15 ; Online:2015-05-01

- 2015 4.1 5.8
A model-based productivity improvement of reinforced concrete work in a multi-housing project

Authors:Soobae An,Soungmin Ji,Changtaek Hyun,Sangwon Han

Keywords:productivity analysis,productivity improvement,CYCLONE,simulation,multi-housing project

DOI:10.1007/s12205-015-0302-7

Received:2013-05-28 ; Revised:2014-02-25 ; Accepted:2014-04-07 ; Online:2015-04-30

- 2015 8.6 10.5
Predictability evaluation of the existing punching shear formulas using failure test and probability-based approach

Authors:Minkwan Ju,Cheolwoo Park,Eui Seung Hwang,Jongsung Sim

Keywords:punching shear formula,FRP bar,concrete slab,predictability,probability analysis

DOI:10.1007/s12205-015-0040-x

Received:2014-01-25 ; Revised:2014-05-02 ; Accepted:2014-07-28 ; Online:2015-04-30

- 2015 2.8 6.1
Vertical arcs design using polynomial transition curves

Authors:Andrzej Kobryń

Keywords:road design,vertical curves,polynomial transition curves

DOI:10.1007/s12205-015-0492-z

Received:2013-08-12 ; Revised:2014-11-11 ; Accepted:2015-01-27 ; Online:2015-04-28

- 2016 14.7 17.8
Issues in simulating falling weight deflectometer test on concrete pavements

Authors:Chen-Ming Kuo,Chih-Chiang Lin,Cheng-Hao Huang,Yi-Cheng Lai

Keywords:FWD,finite element analysis,dynamic analysis,subgrade damping,backcalculation

DOI:10.1007/s12205-015-0299-y

Received:2012-06-15 ; Revised:2013-03-20 ; Accepted:2015-03-23 ; Online:2015-04-28

- 2016 8.8 33.7
Modeling the choice of household vehicle for social-recreational tours

Authors:Kwang-Kyun Lim

Keywords:Activity-based modeling,Joint tours,Primary-driver allocation,Vehicle-type choice

DOI:10.1007/s12205-015-1670-8

Received:2014-10-20 ; Revised:2015-02-26 ; Accepted:2015-03-31 ; Online:2015-04-28

- 2016 3.8 5.4
Delay factor analysis for hospital projects in Vietnam

Authors:Soo-Yong Kim,Kiet Nguyen Tuan,Van Truong Luu

Keywords:factor analysis,hospital construction project,delay,Vietnam

DOI:10.1007/s12205-015-0316-1

Received:2014-06-11 ; Revised:2014-11-13 ; Accepted:2015-03-01 ; Online:2015-04-20

- 2016 4.7 8.8
Structural equation model for construction equipment selection and contractor competitive advantages

Authors:Kattiya Samee,Jakrapong Pongpeng

Keywords:construction equipment,selection,contractor,competitive advantage,Structural Equation Modeling (SEM)

DOI:10.1007/s12205-015-0632-5

Received:2014-10-26 ; Revised:2015-01-17 ; Accepted:2015-02-24 ; Online:2015-04-20

- 2016 2.3 4