ISSN: 1226-7988
官网: http://link.springer.com/journal/12205
出版商: Springer
| Title | Scholar cited | Year | Review Cycle | Accept Cycle |
|---|---|---|---|---|
|
Laboratory investigation of stress state and grain composition affecting internal erosion in soils containing a suspended cut-off wall
Keywords:internal erosion,stress state,grain composition,suspended cut-off wall,dilatancy,erosion mechanism Received:2014-11-28 ; Revised:2015-04-16 ; Accepted:2015-05-22 ; Online:2015-06-26 |
- | 2016 | 4.2 | 5.8 |
|
The runoff uncertainty caused by the mismatch between the radar rain rate and the topographical information data
Keywords:ModClark,radar rain rate,topographic information data,horizontal drift distance,runoff uncertainty Received:2014-05-13 ; Revised:2014-12-04 ; Accepted:2015-01-09 ; Online:2015-06-26 |
- | 2016 | 6.4 | 8 |
|
An experimental research on self-consolidating concrete using tungsten Mine Tailings
Keywords:Tungsten mine Tailings (TMT),viscosity,yield stress,carbonation depth,drying shrinkage rate Received:2014-04-13 ; Revised:2014-09-27 ; Accepted:2015-05-25 ; Online:2015-06-22 |
- | 2016 | 5.1 | 13.6 |
|
An improvement approach based on DEA-game theory for comparison of operational and spatial efficiencies in urban transportation systems
Keywords:data envelopment analysis,game theory,transportation,operational measures,spatial measures,unified efficiency Received:2014-06-25 ; Revised:2015-03-09 ; Accepted:2015-05-06 ; Online:2015-06-22 |
- | 2016 | 8.1 | 10.5 |
|
Characteristics of desulfurized rubber asphalt and mixture
Keywords:desulfurized rubber,crumb rubber,asphalt,modification mechanism,performance Received:2015-03-09 ; Revised:2015-04-29 ; Accepted:2015-05-28 ; Online:2015-06-22 |
- | 2016 | 1.2 | 2.7 |
|
Unit modular in-fill construction method for high-rise buildings
Keywords:prefabricated construction,modular technology,modular in-fill method,cost effectiveness,schedule compression Received:2015-03-09 ; Revised:2015-04-30 ; Accepted:2015-05-19 ; Online:2015-06-22 |
- | 2016 | 1.3 | 2.4 |
|
Numerical simulation of flow past two circular cylinders in tandem and side-by-side arrangement at low Reynolds numbers
Keywords:drag coefficient,circular cylinder,vortex shedding,wake,separation Received:2014-10-10 ; Revised:2015-02-28 ; Accepted:2015-05-22 ; Online:2015-06-22 |
- | 2016 | 4.2 | 7.5 |
|
Development of a crack recognition algorithm from non-routed pavement images using artificial neural network and binary logistic regression
Keywords:crack recognition,crack sealing machine,noise elimination,artificial neural network,binary logistic regression analysis,crack detection algorithm Received:2014-10-28 ; Revised:2015-04-06 ; Accepted:2015-05-22 ; Online:2015-06-22 |
- | 2016 | 4.9 | 6.9 |
|
A comparison of Artificial Neural Networks (ANN) and Local Linear Regression (LLR) techniques for predicting monthly reservoir levels
Keywords:reservoir level,Artificial Neural Network ANN,Local Linear Regression LLR,Gamma Test (GT) Received:2014-06-02 ; Revised:2014-11-15 ; Accepted:2015-02-07 ; Online:2015-06-19 |
- | 2016 | 5.1 | 8.3 |
|
Use of Shitalakhya River Water as makeup water in power plant cooling system
Keywords:corrosion,corrosion inhibitor,metal alloys,recirculating cooling systems,weight loss Received:2014-07-07 ; Revised:2014-11-28 ; Accepted:2014-12-08 ; Online:2015-06-19 |
- | 2016 | 4.3 | 5.1 |