ISSN: 1226-7988
官网: http://link.springer.com/journal/12205
出版商: Springer
| Title | Scholar cited | Year | Review Cycle | Accept Cycle |
|---|---|---|---|---|
|
Integrated flood risk analysis in a changing climate: A case study from the Korean Han River Basin
Keywords:flood risk index,hazard,vulnerability,han river basin Received:2013-03-06 ; Revised:2013-08-13 ; Accepted:2013-08-16 ; Online:2014-05-20 |
- | 2014 | 4.9 | 5.4 |
|
Random field-based reliability analysis of prestressed concrete bridges
Keywords:random field,prestressed concrete bridges,spatial variability,reliability method,failure probability,limit state function Received:2012-05-22 ; Revised:2013-08-12 ; Accepted:2013-08-28 ; Online:2014-05-20 |
- | 2014 | 14.4 | 15.4 |
|
Assessment of CII Best Practices usage in the construction industry
Keywords:best practices usage,knowledge implementation,knowledge management,construction industry institute Received:2013-04-17 ; Accepted:2013-08-01 ; Online:2014-05-20 |
- | 2014 | 2.8 | 3.5 |
|
Verification of lean construction benefits through simulation modeling: A case study of bricklaying process
Keywords:lean construction principles,simulation modeling,labor productivity,performance improvement Received:2012-06-16 ; Revised:2013-05-22 ; Accepted:2013-08-14 ; Online:2014-05-20 |
- | 2014 | 10.9 | 14.1 |
|
Extreme wind climate modeling of some locations in India for the specification of the design wind speed of structures
Keywords:thunderstorm,cyclone,Poisson distribution,generalized Pareto distribution,extreme value distribution,design wind speed Received:2012-08-16 ; Revised:2013-08-11 ; Accepted:2013-08-28 ; Online:2014-05-20 |
- | 2014 | 11.5 | 12.6 |
|
Identification of spillovers in urban street networks based on upstream fixed traffic data
Keywords:occupancy,spillover,queue length,simulation,significance analysis Received:2012-10-29 ; Revised:2013-04-13 ; Accepted:2013-08-27 ; Online:2014-05-20 |
- | 2014 | 5.1 | 10.1 |
|
Implementing earned value management using bridge information modeling
Keywords:building information modeling,infrastructure bridges,bridge information modeling,cost estimate,time and cost control Received:2012-09-04 ; Revised:2013-05-17 ; Accepted:2013-08-26 ; Online:2014-05-20 |
- | 2014 | 8 | 11.9 |
|
Applying rough random MODM model to resource-constrained project scheduling problem: A case study of Pubugou Hydropower Project in China
Keywords:large-scale scheduling,rough random variable,resource-constrained,multi-mode,multiple objective decision making,MOPSO Received:2012-08-16 ; Revised:2013-03-08 ; Accepted:2013-08-26 ; Online:2014-05-20 |
- | 2014 | 6.3 | 12.5 |
|
A novel form analysis method considering pretension process for suspen-dome structures
Keywords:steel structure,suspen-dome,form analysis,pretension process,iterative method Received:2013-02-21 ; Accepted:2013-08-28 ; Online:2014-05-20 |
- | 2014 | 5.6 | 6.3 |
|
New method for the estimation of strong ground motions based on the colonial competitive algorithm
Keywords:attenuation relationship,colonial competitive algorithm,peak ground acceleration,spectral acceleration Received:2012-01-17 ; Accepted:2013-07-26 ; Online:2014-05-20 |
- | 2014 | 17.8 | 18.5 |