ISSN: 1226-7988
官网: http://link.springer.com/journal/12205
出版商: Springer
| Title | Scholar cited | Year | Review Cycle | Accept Cycle |
|---|---|---|---|---|
|
The effect of shape and stiffness of originally different marine soil grains on their contractive and dilative behavior
Keywords:calcareous sand,particle breakage,contraction,dilation,the persian gulf Received:2012-06-06 ; Accepted:2013-07-22 ; Online:2014-04-25 |
- | 2014 | 13 | 13.7 |
|
Implementing chemical precipitation as a pretreatment for phosphorus removal in membrane bioreactor-based municipal wastewater treatment plants
Keywords:coagulants,correlation,phosphorus removal,pretreatment,zeta potential Received:2013-02-01 ; Accepted:2013-04-26 ; Online:2014-04-25 |
- | 2014 | 2.1 | 2.8 |
|
Color expression characteristics and physical properties of colored mortar using ground granulated blast furnace slag and White Portland Cement
Keywords:colored concrete,GGBFS,color evaluation,strength,workability Received:2012-09-03 ; Revised:2013-04-21 ; Accepted:2013-07-26 ; Online:2014-04-25 |
- | 2014 | 7.2 | 10.9 |
|
Seismic behaviour of isolated fluid storage tanks: A-state-of-the-art review
Keywords:base isolation,seismic excitation,ground-supported fluid storage tank,elevated fluid storage tank Received:2012-03-24 ; Revised:2012-08-03 ; Accepted:2013-06-22 ; Online:2014-04-25 |
- | 2014 | 3.9 | 15.2 |
|
Design and evaluation of actuated four-phase signal control at diamond interchanges
Keywords:actuated,four-phase control,diamond interchange,CORSIM,signal phasing Received:2012-10-04 ; Revised:2013-03-29 ; Accepted:2013-06-26 ; Online:2014-04-25 |
- | 2014 | 5.4 | 8.8 |
|
Determining labor productivity diagram in high-rise building using straight-line model
Keywords:labor productivity,high-rise building,repetitive activities,straight-line model,Vietnam Received:2012-10-23 ; Revised:2013-03-18 ; Accepted:2013-06-28 ; Online:2014-04-25 |
- | 2014 | 4.4 | 8.3 |
|
Probabilistic multiobjective optimization of sustainable engineering design
Keywords:sustainable development,construction engineering,multiobjective optimization,particle swarm algorithm,probabilistic simulation,risk analysis Received:2011-11-21 ; Accepted:2013-06-20 ; Online:2014-04-25 |
- | 2014 | 18.5 | 19.2 |
|
The relationship between communication and construction safety climate in China
Keywords:safety,climate,communication,social network analysis,construction Received:2012-10-01 ; Revised:2013-02-05 ; Accepted:2013-06-20 ; Online:2014-04-25 |
- | 2014 | 3.8 | 8.7 |
|
Precutting of tunnel perimeter for reducing blasting-induced vibration and damaged zone — numerical analysis
Keywords:vibration reduction,tunnel blasting,numerical analysis,precutting free surface,line-drilling Received:2011-12-02 ; Accepted:2013-07-22 ; Online:2014-04-25 |
- | 2014 | 19.2 | 19.9 |
|
An analysis model for wind resistance performance of automated exterior wall painting robots in apartment buildings
Keywords:exterior wall painting,painting robot,computational fluid dynamics,wind resistance performance,wind resistance safety Received:2012-12-26 ; Accepted:2013-06-14 ; Online:2014-04-25 |
- | 2014 | 5 | 5.7 |