国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Tunnelling and Underground Space Technology

ISSN: 0886-7798

官网: https://www.sciencedirect.com/journal/tunnelling-and-underground-space-technology

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle

Comparative study of construction methods for deep excavations above shield tunnels

DOI:10.1016/j.tust.2017.09.014

Received:2017-01-17 ; Revised:2017-09-07 ; Accepted:2017-09-10 ; Online:2017-09-15

- 2018 7.3 7.9
Probabilistic analysis of tunnels considering uncertainty in peak and post-peak strength parameters

DOI:10.1016/j.tust.2017.09.013

Received:2017-02-10 ; Revised:2017-09-06 ; Accepted:2017-09-07 ; Online:2017-09-14

- 2017 6.5 7
Optimization of smooth blasting parameters for mountain tunnel construction with specified control indices based on a GA and ISVR coupling algorithm

DOI:10.1016/j.tust.2017.09.007

Received:2017-03-02 ; Revised:2017-08-31 ; Accepted:2017-09-05 ; Online:2017-09-13

- 2017 5.6 6.2
Scaling rockburst hazard using the DDA and GSI methods

DOI:10.1016/j.tust.2017.09.010

Received:2017-01-08 ; Revised:2017-08-31 ; Accepted:2017-09-05 ; Online:2017-09-13

- 2017 7.4 8

Fuzzy comprehensive Bayesian network-based safety risk assessment for metro construction projects

DOI:10.1016/j.tust.2017.09.012

Received:2016-10-21 ; Revised:2017-08-04 ; Accepted:2017-09-05 ; Online:2017-09-13

- 2017 9.1 10.6
Construction technology for a shallow-buried underwater interchange tunnel with a large span

DOI:10.1016/j.tust.2017.09.009

Received:2015-11-24 ; Revised:2017-09-04 ; Accepted:2017-09-05 ; Online:2017-09-12

- 2017 21.2 21.7

Dynamic numerical simulation of cutterhead loads in TBM tunnelling

DOI:10.1016/j.tust.2017.08.028

Received:2016-04-08 ; Revised:2017-04-20 ; Accepted:2017-08-27 ; Online:2017-09-09

- 2017 12.1 16.9
A probabilistic approach for assessing failure risk of cutting tools in underground excavation

DOI:10.1016/j.tust.2017.08.029

Received:2016-06-24 ; Revised:2017-02-06 ; Accepted:2017-08-27 ; Online:2017-09-09

- 2017 7.1 14.3

Directional projection in stereographic representation of three-dimensional stress redistribution during tunnelling

DOI:10.1016/j.tust.2017.09.001

Received:2016-01-10 ; Revised:2017-08-04 ; Accepted:2017-09-03 ; Online:2017-09-09

- 2017 18.6 20.1

Elastic solutions for circular tunnel with void behind lining

DOI:10.1016/j.tust.2017.08.032

Received:2016-11-21 ; Revised:2017-08-02 ; Accepted:2017-08-30 ; Online:2017-09-08

- 2017 8 9.4