国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Tunnelling and Underground Space Technology

ISSN: 0886-7798

官网: https://www.sciencedirect.com/journal/tunnelling-and-underground-space-technology

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle
Evaluating stability of underground entry-type excavations using multivariate adaptive regression splines and logistic regression

DOI:10.1016/j.tust.2017.07.013

Received:2016-09-21 ; Revised:2017-03-02 ; Accepted:2017-07-30 ; Online:2017-08-04

- 2017 4.9 10.4

Correlation between the kinematics of a Tunnel Boring Machine and the observed soil displacements

DOI:10.1016/j.tust.2017.07.014

Received:2016-04-04 ; Revised:2017-07-29 ; Accepted:2017-07-30 ; Online:2017-08-04

- 2017 15.6 16.1
Applying improved artificial neural network models to evaluate drilling rate index

DOI:10.1016/j.tust.2017.07.017

Received:2016-11-19 ; Revised:2017-07-14 ; Accepted:2017-07-30 ; Online:2017-08-03

- 2017 7.4 8.4

An analytical model for the control of silica grout penetration in natural groundwater systems

DOI:10.1016/j.tust.2017.06.023

Received:2015-12-08 ; Revised:2017-05-15 ; Accepted:2017-06-21 ; Online:2017-08-02

- 2017 17 18.7
Probabilistic analysis of tunnels: A hybrid polynomial correlated function expansion based approach

DOI:10.1016/j.tust.2017.07.009

Received:2017-03-13 ; Revised:2017-07-11 ; Accepted:2017-07-14 ; Online:2017-07-27

- 2017 3.5 4.1
Compression-shear behavior of a scaled immersion joint with steel shear keys

DOI:10.1016/j.tust.2017.07.007

Received:2015-12-16 ; Revised:2017-07-12 ; Accepted:2017-07-12 ; Online:2017-07-26

- 2017 18.7 19.1

Boreholes plans optimization methodology combining geostatistical simulation and simulated annealing

DOI:10.1016/j.tust.2017.07.003

Received:2017-02-07 ; Revised:2017-07-04 ; Accepted:2017-07-05 ; Online:2017-07-24

- 2017 4.4 4.9
The support characteristic curve for blocked steel sets in the convergence-confinement method of tunnel support design

DOI:10.1016/j.tust.2017.04.003

Received:2017-03-08 ; Revised:2017-03-17 ; Accepted:2017-04-02 ; Online:2017-07-24

- 2017 0.3 0.8
Improving the diagnosis methodology for masonry tunnels

DOI:10.1016/j.tust.2017.07.002

Received:2015-10-31 ; Revised:2017-06-29 ; Accepted:2017-07-04 ; Online:2017-07-23

- 2017 19.8 20.4
Effects of transient adaptation on drivers’ visual performance in road tunnel lighting

DOI:10.1016/j.tust.2017.07.008

Received:2017-04-06 ; Revised:2017-06-24 ; Accepted:2017-07-14 ; Online:2017-07-19

- 2017 2.2 3.3