国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Tunnelling and Underground Space Technology

ISSN: 0886-7798

官网: https://www.sciencedirect.com/journal/tunnelling-and-underground-space-technology

出版商: Elsevier

Title Scholar cited Year Review Cycle Accept Cycle
Modified dynamic stress concentration factor for twin tunnels using a novel approach of FEM-scattering

DOI:10.1016/j.tust.2017.07.006

Received:2015-08-22 ; Revised:2017-05-05 ; Accepted:2017-07-10 ; Online:2017-07-15

- 2017 20.3 22.9
Rockburst characteristics and numerical simulation based on a strain energy density index: A case study of a roadway in Linglong gold mine, China

DOI:10.1016/j.tust.2017.05.011

Received:2016-04-04 ; Revised:2017-05-10 ; Accepted:2017-05-15 ; Online:2017-07-14

- 2017 12.9 13.5

A preliminary investigation of underground residential buildings: Advantages, disadvantages, and critical risks

DOI:10.1016/j.tust.2017.07.004

Received:2017-01-26 ; Revised:2017-07-08 ; Accepted:2017-07-10 ; Online:2017-07-14

- 2017 5 5.5

Editorial Board

DOI:10.1016/S0886-7798(17)30633-8

Online:2017-07-13

- 2017 - -

A simplified model for predicting grout flow in fracture channels

DOI:10.1016/j.tust.2017.06.024

Received:2016-05-31 ; Revised:2017-06-03 ; Accepted:2017-06-20 ; Online:2017-07-07

- 2017 11.8 12.8
Time-dependent jamming mechanism for Single-Shield TBM tunneling in squeezing rock

DOI:10.1016/j.tust.2017.06.020

Received:2016-10-19 ; Revised:2017-06-19 ; Accepted:2017-06-20 ; Online:2017-07-03

- 2017 7.6 8.1
Reliability based design optimization for a rock tunnel support system with multiple failure modes using response surface method

DOI:10.1016/j.tust.2017.06.017

Received:2016-08-10 ; Revised:2017-06-17 ; Accepted:2017-06-19 ; Online:2017-06-30

- 2017 9.9 10.4
Identification of geological structure which induced heavy water and mud inrush in tunnel excavation: A case study on Lingjiao tunnel

DOI:10.1016/j.tust.2017.06.014

Received:2017-01-20 ; Revised:2017-04-12 ; Accepted:2017-06-09 ; Online:2017-06-29

- 2017 2.3 4.7

Optimum pattern of ground improvement for enhancing seismic resistance of existing box culvert buried in soft ground

DOI:10.1016/j.tust.2017.06.022

Received:2016-03-14 ; Revised:2017-03-23 ; Accepted:2017-06-20 ; Online:2017-06-28

- 2017 12 15.4

Utilities tunnel’s finance design for the process of construction and operation

DOI:10.1016/j.tust.2017.06.005

Received:2017-04-08 ; Revised:2017-05-26 ; Accepted:2017-06-06 ; Online:2017-06-27

- 2017 1.1 2