国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Journal of Construction Engineering and Management

ISSN: 0733-9364

官网: https://ascelibrary.org/journal/jcemd4

出版商: ASCE

Title Scholar cited Year Review Cycle Accept Cycle
Complexity Analysis Approach for Prefabricated Construction Products Using Uncertain Data Clustering

DOI:10.1061/(ASCE)CO.1943-7862.0001520

Received:2017-09-29 ; Accepted:2018-02-05 ; Online:2018-05-25

- 2018 3.6 4.3
Matching Construction Workers across Views for Automated 3D Vision Tracking On-Site

DOI:10.1061/(ASCE)CO.1943-7862.0001508

Received:2017-08-15 ; Accepted:2018-01-03 ; Online:2018-05-15

- 2018 4 4.7
Examining the Relationship between Construction Workers’ Visual Attention and Situation Awareness under Fall and Tripping Hazard Conditions: Using Mobile Eye Tracking

DOI:10.1061/(ASCE)CO.1943-7862.0001516

Received:2017-08-01 ; Accepted:2018-01-23 ; Online:2018-05-15

- 2018 5.1 5.8
Assessing the Influence of Virtuality on the Effectiveness of Engineering Project Networks: “Big Five Theory” Perspective

DOI:10.1061/(ASCE)CO.1943-7862.0001494

Received:2017-04-05 ; Accepted:2018-03-09 ; Online:2018-05-12

- 2018 10.6 11.3
Conceptual Model for Developing Resilient Safety Culture in the Construction Environment

DOI:10.1061/(ASCE)CO.1943-7862.0001522

Received:2017-09-05 ; Accepted:2018-02-07 ; Online:2018-05-11

- 2018 4.5 5.2
Long-Run Construction Cost Trends: Baumol’s Cost Disease and a Disaggregate Look at Building Material Price Dynamics

DOI:10.1061/(ASCE)CO.1943-7862.0001511

Received:2017-04-25 ; Accepted:2018-01-15 ; Online:2018-05-09

- 2018 8.1 8.8

Enhancing BIM Performance in EPC Projects through Integrative Trust-Based Functional Contracting Model

DOI:10.1061/(ASCE)CO.1943-7862.0001521

Received:2017-09-20 ; Accepted:2018-02-05 ; Online:2018-05-08

- 2018 3.9 4.6
Impact of Skilled Labor Availability on Construction Project Cost Performance

DOI:10.1061/(ASCE)CO.1943-7862.0001512

Received:2017-07-24 ; Accepted:2018-01-15 ; Online:2018-05-03

- 2018 5.1 5.8
4D-BIM Dynamic Time–Space Conflict Detection and Quantification System for Building Construction Projects

DOI:10.1061/(ASCE)CO.1943-7862.0001504

Received:2017-08-15 ; Accepted:2017-12-18 ; Online:2018-04-30

- 2018 3.5 4.2
Automating the Use of Learning Curve Models in Construction Task Duration Estimates

DOI:10.1061/(ASCE)CO.1943-7862.0001515

Received:2017-05-29 ; Accepted:2018-01-23 ; Online:2018-04-28

- 2018 7.3 8