Measuring and Evaluating Safety Maturity of Construction Contractors: Multicriteria Decision-Making Approach
DOI:10.1061/(ASCE)CO.1943-7862.0001503
Received:2017-05-18 ; Accepted:2017-12-13 ; Online:2018-04-27
|
- |
2018 |
6.3 |
7 |
Hybrid Genetic Algorithm and Linear Programming for Bulldozer Emissions and Fuel-Consumption Management Using Continuously Variable Transmission
DOI:10.1061/(ASCE)CO.1943-7862.0001490
Received:2017-09-06 ; Accepted:2017-11-27 ; Online:2018-04-25
|
- |
2018 |
2 |
2.7 |
Impact of CIM Technologies and Agency Policies on Performance for Highway Infrastructure Projects
DOI:10.1061/(ASCE)CO.1943-7862.0001484
Received:2017-03-29 ; Accepted:2017-11-15 ; Online:2018-04-21
|
- |
2018 |
7 |
7.7 |
Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost
DOI:10.1061/(ASCE)CO.1943-7862.0001510
Received:2017-08-21 ; Accepted:2018-01-03 ; Online:2018-04-19
|
- |
2018 |
3.8 |
4.5 |
Measuring Workers’ Emotional State during Construction Tasks Using Wearable EEG
DOI:10.1061/(ASCE)CO.1943-7862.0001506
Received:2017-08-04 ; Accepted:2017-12-27 ; Online:2018-04-18
|
- |
2018 |
4.1 |
4.8 |
Constraint Programming Approach to Optimizing Project Schedules under Material Logistics and Crew Availability Constraints
DOI:10.1061/(ASCE)CO.1943-7862.0001507
Received:2017-09-13 ; Accepted:2017-12-27 ; Online:2018-04-18
|
- |
2018 |
2.8 |
3.5 |
Legalized Recreational Marijuana: Safety, Ethical, and Legal Perceptions of the Workforce
DOI:10.1061/(ASCE)CO.1943-7862.0001502
Received:2017-08-17 ; Accepted:2017-12-13 ; Online:2018-04-12
|
- |
2018 |
3.2 |
3.9 |
Structural Stakeholder Model in Public Engagement for Construction Development Projects
DOI:10.1061/(ASCE)CO.1943-7862.0001462
Received:2017-03-27 ; Accepted:2017-10-13 ; Online:2018-04-11
|
- |
2018 |
6 |
6.7 |
Key Moderators of the Relationship between Construction Crew Motivation and Performance
DOI:10.1061/(ASCE)CO.1943-7862.0001509
Received:2017-09-29 ; Accepted:2018-01-03 ; Online:2018-04-11
|
- |
2018 |
2.5 |
3.2 |
Systematic Decision-Making Process for Composite Pavement Maintenance
DOI:10.1061/(ASCE)CO.1943-7862.0001447
Received:2016-11-16 ; Accepted:2017-09-12 ; Online:2018-04-10
|
- |
2018 |
9.3 |
10 |