国家高新技术企业
杭州市西湖区优秀创新人才“325”计划入选单位
杭州市高层次人才项目

18668047932    pg2020365

chinasupport@papergoing.com

登录 注册

Journal of Construction Engineering and Management

ISSN: 0733-9364

官网: https://ascelibrary.org/journal/jcemd4

出版商: ASCE

Title Scholar cited Year Review Cycle Accept Cycle
Three-Variance Approach for Updating Earned Value Management

DOI:10.1061/(ASCE)CO.1943-7862.0001491

Received:2017-06-23 ; Accepted:2017-11-28 ; Online:2018-04-10

- 2018 4.6 5.3
Hybrid Approach to Construction Project Risk Management with Simultaneous FMEA/ISO 31000/Evolutionary Algorithms: Empirical Optimization Study

DOI:10.1061/(ASCE)CO.1943-7862.0001486

Received:2017-07-26 ; Accepted:2017-11-21 ; Online:2018-04-06

- 2018 3.2 3.9
Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project

DOI:10.1061/(ASCE)CO.1943-7862.0001498

Received:2017-08-14 ; Accepted:2017-12-05 ; Online:2018-04-06

- 2018 3.1 3.8
Image-and-Skeleton-Based Parameterized Approach to Real-Time Identification of Construction Workers’ Unsafe Behaviors

DOI:10.1061/(ASCE)CO.1943-7862.0001497

Received:2017-07-28 ; Accepted:2017-12-05 ; Online:2018-04-05

- 2018 3.6 4.3

Stability Analysis of Two Parallel Closely Spaced Tunnels Based on Convergence–Confinement Principle

DOI:10.1061/(ASCE)CO.1943-7862.0001496

Received:2017-08-23 ; Accepted:2017-12-05 ; Online:2018-03-30

- 2018 2.8 3.5
Cluster Analysis of Risk Factors from Near-Miss and Accident Reports in Tunneling Excavation

DOI:10.1061/(ASCE)CO.1943-7862.0001493

Received:2017-06-22 ; Accepted:2017-12-05 ; Online:2018-03-30

- 2018 4.8 5.5
Model of Equipment Sharing between Contractors on Construction Projects

DOI:10.1061/(ASCE)CO.1943-7862.0001485

Received:2017-06-08 ; Accepted:2017-11-15 ; Online:2018-03-29

- 2018 4.6 5.3

Workflow Process Model for Flash Track Projects

DOI:10.1061/(ASCE)CO.1943-7862.0001501

Received:2017-05-18 ; Accepted:2017-12-13 ; Online:2018-03-29

- 2018 6.3 7
Characteristics and Evolution of Innovative Collaboration Networks in Architecture, Engineering, and Construction: Study of National Prize-Winning Projects in China

DOI:10.1061/(ASCE)CO.1943-7862.0001499

Received:2017-06-01 ; Accepted:2017-12-13 ; Online:2018-03-29

- 2018 5.8 6.5
Extended Technology-Acceptance Model to Make Smart Construction Systems Successful

DOI:10.1061/(ASCE)CO.1943-7862.0001487

Received:2017-07-30 ; Accepted:2017-11-27 ; Online:2018-03-28

- 2018 3.3 4