ISSN: 0733-9364
官网: https://ascelibrary.org/journal/jcemd4
出版商: ASCE
Title | Scholar cited | Year | Review Cycle | Accept Cycle |
---|---|---|---|---|
Probabilistic Assessment of Cost, Time, and Revenue in a Portfolio of Projects Using Stochastic Agent-Based Simulation
DOI:10.1061/(ASCE)CO.1943-7862.0001476 Received:2017-05-02 ; Accepted:2017-11-15 ; Online:2018-03-14 |
- | 2018 | 5.9 | 6.6 |
Framing Energy Efficiency with Payback Period: Empirical Study to Increase Energy Consideration during Facility Procurement Processes DOI:10.1061/(ASCE)CO.1943-7862.0001464 Received:2017-01-31 ; Accepted:2017-10-18 ; Online:2018-03-13 |
- | 2018 | 8 | 8.7 |
Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach
DOI:10.1061/(ASCE)CO.1943-7862.0001456 Received:2017-07-10 ; Accepted:2017-10-04 ; Online:2018-03-13 |
- | 2018 | 2.2 | 2.9 |
Environmental Product Declarations: Use in the Architectural and Engineering Design Process to Support Sustainable Construction DOI:10.1061/(ASCE)CO.1943-7862.0001481 Received:2017-08-23 ; Accepted:2017-11-15 ; Online:2018-03-13 |
- | 2018 | 2.1 | 2.8 |
Focus Group Study to Explore Critical Factors for Managing Stress of Construction Workers DOI:10.1061/(ASCE)CO.1943-7862.0001477 Received:2017-03-08 ; Accepted:2017-11-15 ; Online:2018-03-09 |
- | 2018 | 7.7 | 8.4 |
Multiple-Fault Classification for Hot-Mix Asphalt Production by Machine Learning
DOI:10.1061/(ASCE)CO.1943-7862.0001470 Received:2017-03-01 ; Accepted:2017-10-23 ; Online:2018-03-09 |
- | 2018 | 7.2 | 7.9 |
Framework for Managing Integration Challenges of Last Planner System in IMPs
DOI:10.1061/(ASCE)CO.1943-7862.0001468 Received:2017-05-03 ; Accepted:2017-10-18 ; Online:2018-02-22 |
- | 2018 | 4.9 | 5.6 |
Identification of Enablers and Constraints of Risk Allocation Using Structuration Theory in the Construction Industry DOI:10.1061/(ASCE)CO.1943-7862.0001471 Received:2017-04-21 ; Accepted:2017-10-26 ; Online:2018-02-20 |
- | 2018 | 5.6 | 6.3 |
Optimizing the Planning of Remote Construction Sites to Minimize Facility Destruction from Explosive Attacks
DOI:10.1061/(ASCE)CO.1943-7862.0001446 Received:2017-03-14 ; Accepted:2017-09-12 ; Online:2018-02-19 |
- | 2018 | 5.4 | 6.1 |
Community-Centric Model for Evaluating Social Value in Projects
DOI:10.1061/(ASCE)CO.1943-7862.0001473 Received:2017-04-21 ; Accepted:2017-10-27 ; Online:2018-02-19 |
- | 2018 | 5.6 | 6.3 |